首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 828 毫秒
1.
Qiao  Dong-sheng  Yin  Li  Yan  Jun  Tang  Wei  Ning  De-zhi  Li  Bin-bin  Ou  Jin-ping 《中国海洋工程》2021,35(5):700-711

The maximum predicting error of the commonly used passive truncated mooring system method may reach 30% due to the difference of dynamic characteristics between the truncated and full-depth mooring line. In this paper, the experimental strategy called three-parameter (displacement, velocity and acceleration) active control method at the truncated point of mooring line is established to implement the synchronous equivalent of motion and force, and the realization of active truncated mooring system for model test is studied theoretically. The influences of three-parameter and one-parameter (displacement) active control strategies on the compensation effects are compared by numerical study. The results show that the established three-parameter active control method can feasibly realize the static and dynamic equivalent of truncated and full-depth mooring system, laying a good foundation for the following physical model test of active truncated mooring system.

  相似文献   

2.
采用集中质量法研究了绷紧式系泊系统中系缆由于松弛-张紧过程产生的冲击张力。建立系泊缆绳离散的集中质量模型,对其独立单元进行受力分析并建立了单元的运动方程。给定缆绳上端点简谐激励,通过Ansys中的Aqwa模块,分析了缆绳的运动响应;针对缆绳运动响应过程中的三种状态进行了模拟计算,探讨了冲击张力产生的条件;研究了缆绳初始预张力、上端点激励幅值和频率、拖曳力系数、弹性模量以及单位长度质量对动态张力的影响。研究结果表明:这些影响因素不仅会影响缆绳动态张力的大小,也会对缆绳中的冲击张力产生一定的影响。  相似文献   

3.
Hybrid model testing technique is widely used in verification of a deepwater floating structure and its mooring system,but the design of the truncated mooring systems which can reproduce both static and dynamic response same as the full-depth mooring system is still a big challenge,especially for the mooting systems with large truncation.A Cell-Tress Spar operated in 1500 m water depth is verified in a wave basin with 4 m water depth.A large truncation factor arises even though a small model scale 1:100 is adopted.Computer program modules for analyzing the static and frequency domain dynamic response of mooting line are combined with multi-objective genetic algorithm NSGA-II to optimize the truncared mooting system.Considering the asymmetry of layout of mooring hnes,two different truncated mooring systems are respectively designed for both directions in which the restoring forces of the.mooting system are quite,different.Not only the static characteristics of the mooting systems are calibrated,but also the dynamic responses of the single truncated mooting line are evaluated through time domain numerical simulation and model tests.The model test results of 100-year storm in the GOM are reconstructed and extrapolated to a full depth.It is found that the experimental and numerical resuits of Spar wave frequency motion agree well,and the dynamic responses of the full-depth mooring lines are better reproduced,but the low frequency surge motion is overestimated due to the smaller mooring-induced damping.It is a feasible method adopting different truncated mooring systems for different directions in which the restoring force characteristics are quite different and cannot be simulated by one truncated mooring system.Hybrid verification of a deepwater platform in wave basin with shallow water depth is still feasible if the truncated mooring systems are properly designed,and numerical extrapolation is necessary.  相似文献   

4.
Physical model tests were conducted to validate numerical models of moored-buoy systems. Three buoy types (sphere, spar and discus) were tested for intrinsic properties, three-dimensional impulse response and three-dimensional dynamic response to two-dimensional regular and random wave excitation. Buoy kinematics were measured using advanced video imaging techniques. Other data collected included upper and lower mooring line tension and mooring line inclination. Physical model development, test and measurement procedures and data collected are discussed.  相似文献   

5.
With the floating structures pushing their activities to the ultra-deep water,model tests have presented a challenge due to the limitation of the existing wave basins.Therefore,the concept of truncated mooring system is implemented to replace the full depth mooring system in the model tests,which aims to have the same dynamic responses as the full depth system.The truncated mooring system plays such a significant role that extra attention should be paid to the mooring systems with large truncation factor.Three different types of large truncation factor mooring system are being employed in the simulations,including the homogenously truncated mooring system,non-homogenously truncated mooring system and simplified truncated mooring system.A catenary moored semi-submersible operating at 1000 m water depth is presented.In addition,truncated mooring systems are proposed at the truncated water depth of 200 m.In order to explore the applicability of these truncated mooring systems,numerical simulations of the platform’s surge free decay interacting with three different styles of truncated mooring systems are studied in calm water.Furthermore,the mooring-induced damping of the truncated mooring systems is simulated in the regular wave.Finally,the platform motion responses and mooring line dynamics are simulated in irregular wave.All these simulations are implemented by employing full time domain coupled dynamic analysis,and the results are compared with those of the full depth simulations in the same cases.The results show that the mooring-induced damping plays a significant role in platform motion responses,and all truncated mooring systems are suitable for model tests with appropriate truncated mooring line diameters.However,a large diameter is needed for simplified truncated mooring lines.The suggestions are given to the selection of truncated mooring system for different situations as well as to the truncated mooring design criteria.  相似文献   

6.
具有链—缆—链结构的复合系泊链缆因其相对于全钢链质量和成本上的优势而在深水系泊中得以广泛应用。基于细长杆理论采用有限差分法建立了可以考虑链—缆—链结构的复合系泊缆数值模型,将其应用于不同工况下全钢链和复合链缆运动的数值模拟中,并开展了验证。首先,将单根钢链顶张力数值模拟结果与不同工况下的模型试验结果进行了对比,验证了数值预报程序应用于全钢链的准确性。然后,对于复合系泊链缆开展了静刚度和动刚度迭代数值模拟,并将模拟结果同已发表文章中的算例结果进行比较,验证了该数值模型在复合链缆模拟上的准确性。发现对于单根钢锚链的验证,激励半径越大,激励周期越小,一个周期内顶张力幅值及其极差越大,钢链运动就越剧烈。对于链—缆—链式复合系泊链缆的验证,发现静刚度迭代中数值模拟结果与算例结果差异较小;对于动刚度迭代,除个别大幅慢漂工况外,两者有较高的吻合;且激励周期越小,激励半径越大,复合系泊链缆顶张力越大,弹性模量越小,运动越剧烈。对于聚酯缆刚度的敏感性分析,发现改变动刚度经验公式参数的情况下,杨氏模量的静刚度迭代和动刚度迭代结果误差分别最大达到了60.81%和68.21%,因此合成纤维材料特性对复合系泊链...  相似文献   

7.
In this paper, the impact analysis of air gap concerning the parameters of mooring system for the semi-submersible platform is conducted. It is challenging to simulate the wave, current and wind loads of a platform based on a model test simultaneously. Furthermore, the dynamic equivalence between the truncated and full-depth mooring system is still a tuff work. However, the wind and current loads can be tested accurately in wind tunnel model. Furthermore, the wave can be simulated accurately in wave tank test. The full-scale mooring system and the all environment loads can be simulated accurately by using the numerical model based on the model tests simultaneously. In this paper, the air gap response of a floating platform is calculated based on the results of tunnel test and wave tank. Meanwhile, full-scale mooring system, the wind, wave and current load can be considered simultaneously. In addition, a numerical model of the platform is tuned and validated by ANSYS AQWA according to the model test results. With the support of the tuned numerical model, seventeen simulation cases about the presented platform are considered to study the wave, wind, and current loads simultaneously. Then, the impact analysis studies of air gap motion regarding the length, elasticity, and type of the mooring line are performed in the time domain under the beam wave, head wave, and oblique wave conditions.  相似文献   

8.
以新型激光雷达浮标系统为研究对象,基于ANSYS/AQWA开展了激光雷达浮标系统运动响应特性数值研究,研究了浮标吃水深度、形状参数对于激光雷达浮标运动响应的影响规律,分析了附加质量、辐射阻尼、运动响应RAO及一阶、二阶波浪力等水动力参数。采用时域分析方法对不同风浪流荷载入射角度下的激光雷达浮标锚泊系统张力特性进行了计算分析。研究结果表明:随着浮标吃水深度的增加,浮标纵荡方向响应无明显变化,垂荡响应显著增大;随着浮标底部圆台直径的增大,浮标纵荡方向响应变化较小,而圆柱形浮标垂荡运动响应显著大于圆台形浮标;当浮标系泊锚链发生松弛—张紧状态变化时易出现极端张力,且极端张力出现的幅值和频率随有效波高的增大和谱峰周期的减小而增大。  相似文献   

9.
应用数值模拟与模型试验相结合的方法研究半潜式生产平台系泊状态下的耦合动力特性。建立耦合分析模型,时域内计算求解平台的动力响应,选取缩尺比为1∶60,采用等效截断模型方法对数值模拟结果进行验证。通过对比模型试验与数值模拟结果发现:等效截断系泊系统可以较好地模拟平台的位移响应,但在系泊张力方面却差异较大,此外极端海况下平台的甲板上浪问题也必须得到充分重视。  相似文献   

10.
An analytical model is proposed for predicting the dynamics of instrumented oceanographic surface moorings made up of a combination of wire rope and compliant synthetic rope. The model simplifies the problem by treating only the vertical motion of the buoy and the longitudinal motion of the mooring line and attached instruments. It is demonstrated using full-scale experimental data and numerical simulations, that the simplified model captures all of the important dynamic effects and gives accurate predictions of the dynamic tension at the top of the mooring line. The model shows that the total mass and damping of the instruments and wire rope that make up the stiff upper half of the mooring are the major sources of the dynamic tension. Damping of the instruments becomes a significant factor in larger sea states, especially near the peak frequency of the wave spectrum. Elastic stretching of the wire and synthetic rope make up approximately 10% of the total response. This is based on a coefficient of friction equal to 0.003 which fits the experimental data best.  相似文献   

11.
《Applied Ocean Research》2007,29(1-2):45-54
Catenary mooring lines are typically subjected to bimodal loads, comprising of a wave frequency (WF) component due to the first-order wave forces and a low frequency (LF) component induced by the second-order wave forces. For moored vessels, the LF forces due to current and wind also play a role. Only dynamic wave loads are considered herein, while current and wind loads are modeled as constant forces. Because of the nonlinearities of the mooring line characteristics, the dynamic line tension and the second-order responses, both the WF and LF line tensions are in principle nonGaussian. These facts make it difficult to estimate the combined fatigue damage of mooring lines in the frequency domain. A fatigue combination rule based on the Jiao and Moan’s theory has been extended to cover the nonGaussian case. The purpose of this paper is to improve and validate the frequency-domain method by time-domain analysis based on a simplified, but accurate mechanical model of the dynamic line tension. Improvements on the LF and combined fatigue damage estimation have been made by considering the nonsymmetrical property of the LF line tension distribution. Both the WF and LF mooring line tensions due to wave loading have been simulated in the time domain for different sea states and the combined fatigue damage has been estimated by using the rainflow cycle counting algorithm. The accuracy of the frequency-domain method for estimating the bimodal nonGaussian fatigue damage of mooring lines has been verified by the time-domain simulations and is considered to be acceptable.  相似文献   

12.
The highest similarity degree of static characteristics including both horizontal and vertical restoring force-displacement characteristics of total mooring system, as well as the tension-displacement characteristics of the representative single mooring line between the truncated and full depth system are obtained by annealing simulation algorithm for hybrid discrete variables (ASFHDV, in short). A“baton” optimization approach is proposed by utilizing ASFHDV. After each baton of optimization, if a few dimensional variables reach the upper or lower limit, the boundary of certain dimensional variables shall be expanded. In consideration of the experimental requirements, the length of the upper mooring line should not be smaller than 8 m, and the diameter of the anchor chain on the bottom should be larger than 0.03 m. A 100000 t turret mooring FPSO in the water depth of 304 m, with the truncated water depth being 76 m, is taken as an example of equivalent water depth truncated mooring system optimal design and calculation, and is performed to obtain the conformation parameters of the truncated mooring system. The numerical results indicate that the present truncated mooring system design is successful and effective.  相似文献   

13.
A two-degree freedom model for an ALT-tanker system is established corresponding to the pitch of the ALT and the surge of the tanker.Tension in the mooring cable between the ALT and the tanker is represented by an unsymmetrical,piecewise-nonlinear function.Wave load on the tower is evaluated by use of the Morison equation.The first order wave load acting on the tanker is calculated by the linear diffraction theory based on the 2-D Helmholtz equation,and the near field approach of Pinkster is used to evaluate the second order drift force.The dynamic equation of motion is established based on the principle of D'lembert.Dynamic response and cable tension of a mooring system composed of an 88.4 m ALT and a 100000 t grade tanker are calculated.The influence of wave frequency,wave excitation amplitude,wind and current force on ALT-tanker motion and cable tension is discussed.  相似文献   

14.
通过建立波浪作用下锚碇沉管管段运动的时域数值计算模型,对锚碇沉管的运动响应及锚碇缆受力特性进行了研究。应用集中质量法求解锚碇缆力,应用四阶Runge-Kutta法求解管段时域运动方程,计算了在不同沉深、不同周期、不同波高和不同波向条件下沉管管段的运动幅值和锚碇缆力。数值计算的结果表明:锚碇沉管的锚碇缆对沉管管段的运动起到一定的约束作用,在沉放深度较浅、波浪周期较大时,锚碇缆对沉管管段运动幅度的制约更为明显。通过五种布缆方式的计算与分析,探讨了布缆方式对沉管管段运动响应及锚碇缆受力的影响,并给出了较为合理的布缆方案。  相似文献   

15.
Developments in the study of wave forces and construction techniques in deep water by the offshore oil industry have increased the use of marine terminals at deep water locations. A thorough understanding of moored ship dynamics when subjected to waves, wind and current combined with the use of flexible mooring lines would help to design berthing terminals for exposed areas. In this paper, the three dimensional problem of wave interactions with a barge moored to a single point is dealt with, based on the finite element method. The effect of flexibility of the mooring line and the point of mooring on the response of the barge as well as the mooring line tension is investigated. The paper compares the numerical results with model tests carried out on a barge moored to a fixed support under regular and random waves in head sea. The effect of stiffness of the mooring line on the barge response for different mooring points is discussed, which would be useful for the designers. The effect of viscous damping is also considered. The analytical results are in good agreement with the experimental results in both regular and random waves.  相似文献   

16.
FSRU码头系泊模型实验与数值模拟研究   总被引:1,自引:0,他引:1  
FSRU在恶劣环境条件下的作业和安全停靠性能与系泊缆张力、靠垫挤压应力、船体6自由度运动等参数有关。针对FSRU码头处海洋环境条件,进行FSRU不同装载状况的模型实验,获得FSRU的6自由度运动及其系泊载荷的动力特性。基于三维辐射和绕射理论,使用Sesam软件进行频域计算,以此为基础在相应海洋环境条件下进行时域耦合分析,获得FSRU 6自由度运动、系泊载荷、靠垫应力等参数的响应时历。结果表明:30%装载、横浪条件下FSRU的运动响应最大,系泊缆张力未达到破断值,靠垫压力超过其压缩60%时的载荷;模型实验对FSRU运动响应和系泊缆张力的预测结果可信,靠垫受力情况需要数值仿真进行辅助研究。  相似文献   

17.
深海平台试验中水深截断系泊缆动力特性对比分析   总被引:1,自引:0,他引:1  
在深海平台混合模型试验中,采用大截断比水深截断系泊缆模拟全水深系泊缆的静力和动力特性具有很大的难度.以工作在1 500 m水深的Spar平台系泊系统为例,对比分析5种大截断比水深截断系泊缆的动力特性,研究缆绳轴向刚度、直径和单位长度空气中质量对水深截断系泊缆动力特性的影响规律.认为这三个因素对水深系泊缆的动力响应影响并不是孤立的,需要合理地选取三者的参数,才能使得水深截断系泊缆的动力响应与全水深系泊缆保持一致.  相似文献   

18.
海上结构设计包括对荷载和响应的可靠性评估。对结构进行全面长期响应分析繁琐且费时,故将基于逆一阶可靠性方法的环境包络线进行海上结构概率可靠性分析,对结构的长期响应进行近似估计。在二维标准正态空间中画出与重现期相对应的圆,将圆离散为点后通过Rosenblatt变换转化为环境参数空间中的点来形成闭合的环境包络线。描述海洋环境条件的模型对绘制环境包络线极为重要,基于我国南海荔湾海域40年波浪模拟数据,建立了描述南海波浪的Weibull-Gev条件分布模型,进而绘制南海有效波高—谱峰周期包络线,并与张力腿平台(TLP)系泊张力的长期响应预报结果对比,给出南海海域在波浪作用下应用环境包络线法预报TLP系泊张力的分位数,为未来南海TLP设计中系泊张力预报提供快速估算方法。  相似文献   

19.
This paper presents a simulation model based on the finite element method. The method is used to analyze the motion response and mooring line tension of the flatfish cage system in waves. The cage system consists of top frames, netting, mooring lines, bottom frames, and floats. A series of scaled physical model tests in regular waves are conducted to verify the numerical model. The comparison results show that the simulated and the experimental results agree well under the wave conditions, and the maximum pitch of the bottom frame with two orientations is about 12o. The motion process of the whole cage system in the wave can be described with the computer visualized technology. Then, the mooring line tensions and the motion of the bottom frame with three kinds of weight are calculated under different wave conditions. According to the numerical results, the differences in mooring line tensions of flatfish cages with three weight modes are indistinct. The maximum pitch of the bottom frame decreases with the increase of the bottom weight.  相似文献   

20.
混合模型试验等效水深截断系统优化设计研究   总被引:1,自引:1,他引:1  
进行了深海海洋平台混合模型等效水深截断系统优化设计试验研究,优化方法选用混合离散变量模拟退火法,目标函数为截断系统和原系统的静力特性相似程度。以一个转塔式系泊浮式生产系统为例进行了等效水深截断系统优化设计计算。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号