首页 | 本学科首页   官方微博 | 高级检索  
     检索      

黄河淤背固堤工程不均匀沉降监测
引用本文:李聚方,李艳丽.黄河淤背固堤工程不均匀沉降监测[J].测绘学院学报,2003,20(4):254-256.
作者姓名:李聚方  李艳丽
作者单位:[1]黄河水利职业技术学院测绘工程系,河南开封475001 [2]三义寨渠首闸管理处,河南兰考475301
摘    要:黄河淤背固堤工程因受土压力、水压力以及其它各种因素的作用和影响会产生较大的沉降,且不均匀。长期如此将使大堤产生不均匀裂缝,一旦百年一遇的洪峰到来,抵御洪水的最后一道屏障将岌岌可危,后果不堪设想。文中通过观测、分析与研究得出结论:淤背固堤工程必须同步进行不均匀沉降的监测。

关 键 词:淤背固堤  不均匀沉降  水平位移  监测

Monitor Uneven Settle on Silt Arrester Project of the Yellow River
LI Ju-fang,LI Yan-li.Monitor Uneven Settle on Silt Arrester Project of the Yellow River[J].Journal of Institute of Surveying and Mapping,2003,20(4):254-256.
Authors:LI Ju-fang  LI Yan-li
Institution:LI Ju-fang~1,LI Yan-li~2
Abstract:Silt arrester project of the Yellow River has been suffered by earth pressure, water pressure and all kinds of factors and effects. It will come out uneven settle and uneven crevice. If there should be the biggest flood in a century, it would be in imminent danger. The result would have been dreadful to contemplate. According to observing, analyzing and studying, this paper points out that silt arrester project of the Yellow River must carry out studying and observing uneven settle at the same time.
Keywords:silt arrester  uneven settle  level displace
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号