首页 | 本学科首页   官方微博 | 高级检索  
     

二河闸丰水期淹没式堰流水位流量关系初探
引用本文:姚建栋. 二河闸丰水期淹没式堰流水位流量关系初探[J]. 水文, 2012, 0(1): 69-72,91
作者姓名:姚建栋
作者单位:江苏省淮沭新河管理处
摘    要:二河闸节制闸作为洪泽湖洪水出流的主要水利工程,在其控制运行中多次出现淹没式堰流流态,推求该水情条件下的流量一直采用的是连实测流量过程线法。为了能够更合理地掌握水工建筑物的出流规律,从而使流量推求更加精确,根据二河闸淹没式堰流流态下的历年实测流量资料,对其测验数据进行分析并率定出二河闸丰水期淹没式堰流的水位流量关系曲线。

关 键 词:淹没式堰流  流量系数  枯水期  丰水期

Discussion on Stage-discharge Relation of Erhe Sluice Submerged Overflow in High Water Period
YAO Jiandong. Discussion on Stage-discharge Relation of Erhe Sluice Submerged Overflow in High Water Period[J]. Hydrology, 2012, 0(1): 69-72,91
Authors:YAO Jiandong
Affiliation:YAO Jiandong (Administration Office of Huaishuxin River in Jiangsu Province,Huaian 223305 China)
Abstract:In control operation of the Erhe Sluice(the main outlet of the Hongze River),submerged overflow repeatedly appeared and the observed discharge hydrograph method was frequently used for the flow calculation.By analyzing the observed discharge data and calibrating the rating curve of submerged overflow of the Erhe Sluice in high water period,we can control hydraulic structure regulation more reasonably and make the flow calculation more accurate.
Keywords:submerged overflow  discharge coefficient  drought period  high water period
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号