首页 | 本学科首页   官方微博 | 高级检索  
     检索      

设计潮位过程线及其推求
引用本文:陈静.设计潮位过程线及其推求[J].水文,2012,32(3):47-50.
作者姓名:陈静
作者单位:上海勘测设计研究院,上海,200434
摘    要:针对现行推求设计潮位过程线方法中存在的不合理现象,在分析研究各潮汐要素之间的关系的基础上,提出根据高潮位(或低潮位)与潮差同频率控制放大的方法推求设计潮位过程线。结果表明,用该方法推算得到的设计潮位过程线比较符合实际,能较好地满足工程设计的防洪防潮标准,达到工程预期的效果。

关 键 词:设计潮位过程线  高潮位(低潮位)  潮差  同频率

Design Tide Curve and Derivation Method
CHEN Jing.Design Tide Curve and Derivation Method[J].Hydrology,2012,32(3):47-50.
Authors:CHEN Jing
Institution:CHEN Jing(Shanghai Investigation and Design Institute,Shanghai 200434,China)
Abstract:While the way used to seek the design tide curve are not reasonable in some aspects,here the correlativity of the tidal wave attributive character is studied and one new method is put forward which using the corresponding period of the high tide level(or low tide level) and the tide range controlling the design tide curve for avoiding the reasonless aspects.The result indicates the design tide curve obtained by the method recommend here can reflect the fact and reach the standard of controlling flood or tide better in the design of projects.
Keywords:design tide curve  high tide level(low tide level)  tide range  corresponding period
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号