Unexpected sedimentation patterns upstream and downstream of the Three Gorges Reservoir: Future risks
Authors:Yifan Huang  Jinsheng Wang  Mei Yang
Institution:1. College of Water Sciences, Beijing Normal University, Beijing 100875, PR China;2. Engineering Research Center of Groundwater Pollution Control and Remediation, Ministry of Education, Beijing 100875, PR China;3. National Geomatics Center of China, Beijing 100830, PR China
Abstract:This paper summarizes the latest developments, future prospects, and proposed countermeasures of reservoir sedimentation and channel scour downstream of the Three Gorges Reservoir (TGR) on the Yangtze River in China. Three key results have been found. (1) The incoming sediment load to the TGR has been significantly lower than expected. (2) The accumulated volume of sediment deposition in the TGR is smaller than expected because the overall sediment delivery ratio is relatively low, and the deposition in the near-dam area of the TGR is still developing. (3) River bed scour in the river reaches downstream of the Gezhouba Dam is still occurring and channel scour has extended to reaches as far downstream as the Hukou reach. Significantly, sedimentation of the TGR is less problematic than expected since the start of operation of the TGR on the one hand; on the other hand, the possible increases in sediment risks from dependence on upstream sediment control, deposition in the reservoir, and scour along middle Yangtze River should be paid more attention. (1) Sediment trapped by dams built along the upper Yangtze River and billion tons of loose materials on unstable slopes produced by the Wenchuan Earthquake could be new sediment sources for the upper Yangtze River. More seriously, possible release of this sediment into the upper Yangtze River due to new earthquakes or extreme climate events could overwhelm the river system, and produce catastrophic consequences. (2) Increasing sediment deposition in the TGR is harmful to the safety and efficiency of project operation and navigation. (3) The drastic scour along the middle Yangtze River has intensified the down-cutting of the riverbed and erosion of revetment, it has already led to increasing risk to flood control structures and ecological safety. It is suggested to continue the Field Observation Program, to initiate research programs and to focus on risks of sedimentation.
Keywords:Yangtze River  Three Gorges Reservoir  Sedimentation  Risk
本文献已被 维普 万方数据 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号