首页 | 本学科首页   官方微博 | 高级检索  
     

关于用岩体分类预测TBM掘进速率AR的讨论
引用本文:王旭, 李晓, 李守定. 2008: 关于用岩体分类预测TBM掘进速率AR的讨论. 工程地质学报, 16(4): 470-475.
作者姓名:王旭  李晓  李守定
作者单位:1.中国科学院工程地质力学重点实验室 北京 100029;;2.北方重工沈重集团盾构机公司 沈阳 110025
基金项目:中国科学院知识创新工程项目,国家重点基础研究发展计划(973计划),国家自然科学基金
摘    要:以Maen、Pieve、Cogolo和Varzo 4条隧道为例,本文分析说明了岩体质量分类系统不能预测TBM净掘进速率PR的原因:由于影响岩体可掘进性的因素与影响岩体质量的因素不一样,且岩体质量分类系统多采用半定性半定量的评分形式描述岩体条件,故岩体的质量分数值与TBM的净掘进速率PR很难有一一对应的关系。因此,岩体质量分类系统和基于此的预测模型不能够用来预测TBM的净掘进速率PR。根据TBM施工隧道岩体分类的目的及TBM施工的特点,提出预测TBM净掘进速率PR的岩体分类系统应与评价岩体稳定的岩体分类系统分开进行。用岩体可掘进性分类系统预测净掘进速率PR,用岩体质量分类系统预测TBM利用率U,从而计算出TBM的掘进速率AR。

关 键 词:TBM  岩体分类  可掘进性  掘进速率预测
收稿时间:2007-10-09
修稿时间:2008-03-24

PROBLEMS IN THE PREDICTION OF THE TBM ADVANCE RATE WITH ROCK MASS CLASSIFICATION AND THEIR POSSIBLE SOLUTIONS
WANG Xu, LI Xiao, LI Souding. 2008: PROBLEMS IN THE PREDICTION OF THE TBM ADVANCE RATE WITH ROCK MASS CLASSIFICATION AND THEIR POSSIBLE SOLUTIONS. JOURNAL OF ENGINEERING GEOLOGY, 16(4): 470-475.
Authors:WANG Xu  LI Xiao  LI Souding
Affiliation:1.Key Laboratory of Engineering Geomechanics, Chinese Academy of Sciences, Beijing 100029;;2.NHI Group Shenyang Heavy Machinery TBM Company, Shenyang 110025
Abstract:Taking the TBM performance in four tunnels as case examples,this paper analyzes the two reasons that there are problems in using the conventional rock mass quality classification systems to predict the TBM performance.The first reason is the factors which control the rock mass quality are not the factors that influence the rock mass boreability.The second is that most of the factors in rock mass classification systems are semi-quantitative.As a result of the two reasons,the value of the rock mass quality cannot reflect the rock mass boreabilty.According to the purpose of the rock mass classification for tunnels tunneling by TBM and the features of the TBM cutting process,this paper suggests two systems to classify the rock mass:(a) the rock mass boreability classification system for estimating how difficulty the rock mass are bored by TBM and(b) the rock mass quality classification system for estimating the stability of surrounding rock mass.The factors which are used to classify the rock mass boreability group in the system(a) are lithology,weathering degree and joint characters.The factors which are used to classify the rock mass quality in the system(b) are factors which will cause geological problems in the cutting process.The system(a) predicts the net penetration rate(PR) of the TBM,the system(b) evaluates the utilization(U) of the TBM,then the advance rate(AR) of the TBM is calculated by PR and U.
Keywords:TBM
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《工程地质学报》浏览原始摘要信息
点击此处可从《工程地质学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号