首页 | 本学科首页   官方微博 | 高级检索  
     检索      


New equations for predicting the field penetration index of tunnel boring machines in fractured rock mass
Authors:Saffet Yagiz
Institution:1.Department of Geological Engineering, Faculty of Engineering,Pamukkale University,Denizli,Turkey
Abstract:The Queens Water Tunnel No. 3, stage 2 having 7.5-km length and 7-m diameter, is excavated by a high-power tunnel boring machine (TBM) underneath Brooklyn and Queens area for distributing freshwater throughout the New York City, USA. This paper offers a review of the project by considering the TBM performance and rock mass interaction. Using the individual cutter force, intact, and mass rock properties, TBM performance by means of field penetration index (FPI) was predicted and compared with actual results obtained in the field. Further, the study involves statistical analysis of the laboratory and field data including machine, intact, and mass rock properties to develop new empirical equations to estimate FPI. It is stated that the FPI, also converted to the rate of penetration, could be estimated utilizing intact and mass rock properties together with cutter force for similar type of rocks with correlation coefficient of 0.88.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号