To control vertical movements in the Orinoco Oil Belt, a high-precision levelling network was installed in an area of about 100 km2. Links to the National Geodetic Network were established.
A total of 190 BMs with deep pile foundations is already installed and the first measurement campaign was concluded. The accuracies obtained are those of first-order levelling works.