首页 | 本学科首页   官方微博 | 高级检索  
     检索      

黄河内蒙古段头道拐断面冰期水流特征及其对气候变化与人类活动的响应
引用本文:刘吉峰,王春青,赵娜,赵乐.黄河内蒙古段头道拐断面冰期水流特征及其对气候变化与人类活动的响应[J].冰川冻土,2014,36(2):424-429.
作者姓名:刘吉峰  王春青  赵娜  赵乐
作者单位:1. 黄河水利委员会 水文局, 河南 郑州 450004;2. 黄河水利委员会 宁蒙水文水资源局, 内蒙古 包头 014030
基金项目:水利部公益性项目(201301062);黄河水文科技项目(H1103)资助
摘    要:利用最新冰凌观测数据,分析了1960年以来黄河内蒙古段头道拐断面冰期流量特点及其影响因素.结果表明:头道拐断面小流量持续时间的年际变化具有明显的阶段性特征,1960-1967年、1968-1985年和1986-2010年小流量平均持续天数分别为68 d、17 d和37 d.气候变化和人类活动是影响小流量过程的主要因素,气候变化通过影响冰盖厚度和冰花堆积来影响封冻河段流量过程;河道冲淤演变则是冰期流量过程和槽蓄水增量长期变化的重要原因;刘家峡水库调度直接影响着内蒙古河段的流量过程. 最近10 a来,凌汛期气温变化剧烈,上游来水有所减少,河道淤积更加严重,河道工程增多是黄河头道拐断面小流量持续天数延长的主要原因.

关 键 词:河道过流能力  小流量过程  槽蓄水增量  黄河内蒙古河段  
收稿时间:2013-09-09
修稿时间:2013-12-25

Characteristic of winter discharge and its responses to climate change and human activities at Toudaoguai section of the Yellow River
LIU Jifeng,WANG Chunqing,ZHAO Na,ZHAO Le.Characteristic of winter discharge and its responses to climate change and human activities at Toudaoguai section of the Yellow River[J].Journal of Glaciology and Geocryology,2014,36(2):424-429.
Authors:LIU Jifeng  WANG Chunqing  ZHAO Na  ZHAO Le
Institution:1. Hydrology Bureau, Yellow River Conservancy Commission, Zhengzhou 450004, China;2. Hydrology and Water Resources Bureau of the Ningxia-Inner Mongolia Reaches, Yellow River Conservancy Commission, Baotou 014030, Inner Mongolia, China
Abstract:Based on the latest observed ice data, characteristics of winter discharge process at Toudaoguai Hydrologic Section of the Yellow River since 1960 were analyzed. It is found that annual variation of low discharge days have obviously stage characteristics: The average days of low discharge at Toudaoguai Section in 1960-1967, 1968-1985 and 1986-2010 was 68, 17 and 37 d, respectively. Climate change and human activities are the main reasons of low discharge. Climate change impacts the channel discharge by frazil slush and ice cover growth; channel condition is the important reason for long term change of low discharge and channel-storage increment; Liujiaxia Reservoir operation directly influences the runoff process in the Inner Mongolia reaches. The main causes of low discharge days increasing in recent decade are violentair temperature variation, incoming runoff decreasing, severe channel sediment deposition and river projects increasing.
Keywords:flow capacity  low discharge process  channel storage  Inner Mongolia Reaches of the Yellow River
本文献已被 CNKI 等数据库收录!
点击此处可从《冰川冻土》浏览原始摘要信息
点击此处可从《冰川冻土》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号