超前地质预报系统的提出及其发展方向
引用本文:罗利锐,刘志刚,闫怡冲. 超前地质预报系统的提出及其发展方向[J]. 岩土力学, 2011, 32(Z1): 614-0618
作者姓名:罗利锐  刘志刚  闫怡冲
作者单位:1. 中冶建筑研究总院有限公司,北京 100088;2. 中国京冶工程技术有限公司,北京 100088; 3. 石家庄铁道大学,石家庄 050043;4. 中国地质大学(北京),北京 100083
基金项目:财政部自然科学基金资助项目(财企[2007]184号文)
摘    要:总结了超前地质预报的作用和发展现状,分析了超前地质预报认识上的误区和各种探测设备存在的问题。提出了超前地质预报系统的概念,阐述了隧道所在地区地质分析技术、隧道不良地质体超前预报技术、重大施工地质灾害临近警报技术包含的内容。系统的工作步骤为,利用地质分析技术结论以及地质复杂程度分级标准对探测区段的围岩进行地质复杂程度分级,针对不同级别的地质复杂程度,制定与其对应的超前地质预报系统方案,并注意现场工作中动态控制的应用。以厦门海底隧道F3风化深槽为例,对超前地质预报系统的内容及工作步骤进行了应用。提出了超前地质预报系统的发展方向。研究旨在完善超前地质预报工作,使超前地质预报结果在现场施工过程中能真正起到指导性的作用,最大程度地减少地质灾害造成的人员伤亡和财产损失

关 键 词:超前地质预报系统  地质复杂程度分级  地质灾害  地质分析技术  
收稿时间:2010-10-11

The concept and development of geological prediction system
LUO Li-rui,LIU Zhi-gang,YAN Yi-chong. The concept and development of geological prediction system[J]. Rock and Soil Mechanics, 2011, 32(Z1): 614-0618
Authors:LUO Li-rui  LIU Zhi-gang  YAN Yi-chong
Affiliation:1. Central Research Institute of Beijing and Construction Co., Ltd., MCC Group,Beijing 100088, China; 2. China Jingye Engineering Corporation Limited, Beijing 100088, China; 3. Shijiazhuang Railway University, Shijiazhuang 050043, China; 4. China University of Geosciences, Beijing 100083, China
Abstract:The function and development of geological prediction are summarized. The misunderstanding of geological prediction and problems of various instruments are analyzed. The concept of geological prediction system is proposed. The contents of geological analysis technology of the tunnel area,prediction technology of bad geological bodies, and warning technology for close major geological disasters are illuminated. The steps of geological prediction system are as follows: the geological factors are classified by intricacy according to the conclusions of geological analysis technology and standards for intricacy classification of geological factors; different programs of geological prediction system are formulated for different geological intricacy degrees; and dynamic control on the site is considered. The geological prediction system is applied to an example of F3 weathered slots of Xiamen subsea tunnel. Finally, the development trend of geological prediction system is put forward. The purpose of this research is to improve the geological prediction work,make the geological prediction results really play a guiding role in the construction process on the site, so as to decrease the investment and casualties of the project to the best extent.
Keywords:geological prediction system  geological intricacy classification  geological disaster  geological analysis technology  