首页 | 本学科首页   官方微博 | 高级检索  
     

大瑞铁路保山至瑞丽段及邻区地壳稳定性定量评价
引用本文:郭长宝,张永双,屈科,熊探宇,付晓晓,杜宇本. 大瑞铁路保山至瑞丽段及邻区地壳稳定性定量评价[J]. 地质力学学报, 2014, 20(1): 70-81
作者姓名:郭长宝  张永双  屈科  熊探宇  付晓晓  杜宇本
作者单位:1.中国地质科学院地质力学研究所, 北京 100081
基金项目:“十二五”科技支撑计划课题(2011BAK12B09,2012BAK10B02);科技基础性工作专项(2011FY110102);铁道部科技研究开发计划项目(2008G027-B)
摘    要:大瑞铁路地处印度板块与欧亚板块碰撞带附近,地质构造条件复杂,活动断裂、高地应力、高地温、深埋隧道岩爆、软岩大变形等与地壳稳定性相关的地质问题严重制约着铁路工程规划建设。通过对大瑞铁路保山—瑞丽段及邻区地质背景、新构造活动、地壳隆升速率、潜在震源区、构造应力场、岩土体工程地质特征、地质灾害特征等因子分析,采用基于GIS的层次分析法,按照稳定、较稳定、较不稳定和不稳定4个等级,对大瑞铁路保山至瑞丽段及邻区的地壳稳定性进行了综合评价,将其划分为88个区;推荐线路C12K方案穿越19个地壳稳定性分区,其中不稳定分区占全线长度的9.79%,较不稳定分区占46.70%,较稳定分区占36.70%,稳定分区占6.81%。地壳稳定性评价结果对于指导铁路规划建设和线路优化具有重要的意义。 

关 键 词:大瑞铁路   高黎贡山   活动断裂   地壳稳定性   铁路选线
收稿时间:2013-11-12

QUANTITATIVE EVALUATION OF CRUSTAL STABILITY ALONG THE BAOSHAN-RUILI SECTION OF DALI-RUILI RAILWAY AND ITS ADJACENT REGION
GUO Chang-bao,ZHANG Yong-shuang,QU Ke,XIONG Tan-yu,FU Xiao-xiao and DU Yu-ben. QUANTITATIVE EVALUATION OF CRUSTAL STABILITY ALONG THE BAOSHAN-RUILI SECTION OF DALI-RUILI RAILWAY AND ITS ADJACENT REGION[J]. Journal of Geomechanics, 2014, 20(1): 70-81
Authors:GUO Chang-bao  ZHANG Yong-shuang  QU Ke  XIONG Tan-yu  FU Xiao-xiao  DU Yu-ben
Affiliation:1.Institute of Geomechanics, Chinese Academy of Geological Sciences, Beijing 100081, China2.Key Laboratory of Neotectonic Movement and Geohazard, Ministry of Land and Resources, Beijing 100081, China3.China Railway Eryuan Engineering Group Co. Ltd., Chengdu 610031, China
Abstract:The Dali-Ruili Railway is located near the India and Eurasian plate 's collision belt,where the geologic structure conditions are very complicated. The railway planning and constructionsare restricted by the complex engineering geological problems related to the crustal stability, such asactive fault, high geo-stress, rock burst of deep tunnel, large deformation of soft rock. This papermake the crustal stability zoning assessment on the basis of crustal stability influencing factorsanalysis, including the geological background, new tectonic movement, crust uplift rates, potentialseismic source area analysis, tectonic stress field, engineering geological characteristics of rock andsoil mass, as well as the geological hazards characteristics. The AHP method based on GIS was usedin the analyzing process. As a result, the crustal stability is divided into 4 grades: stable area,relatively-stable area, relatively unstable area and unstable area. 88 zoning sections are made alongthe Baoshan-Ruili section of Dali-Ruili Railway and its adjacent region. According to the zoningresult, there are 19 crustal stability zoning sections along the recommended C12K scheme, including9.79% of unstable area, 46.71% of relatively unstable area, 36.7% of relatively-stable area, and6. 18% of stable area. The regional crustal stability assessments have some important significance forthe railway construction and line optimization.
Keywords:Dali-Ruili railway  Mr. Gaoligong  active faults  regional crustal stability  railwaylocation research
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《地质力学学报》浏览原始摘要信息
点击此处可从《地质力学学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号