首页 | 本学科首页   官方微博 | 高级检索  
     

复杂环境下浅埋暗挖隧道穿越薄富含水层冻结温度场研究
引用本文:袁云辉,杨平,江天堑. 复杂环境下浅埋暗挖隧道穿越薄富含水层冻结温度场研究[J]. 岩土力学, 2010, 31(Z1): 388-393
作者姓名:袁云辉  杨平  江天堑
作者单位:1.南京林业大学 土木工程学院,南京 210037;2. 中铁隧道集团公司二处,北京 102200
基金项目:江苏省六大人才高峰项目资助,江苏省普通高校研究生科研创新计划 
摘    要:提出了南京地铁2号线新街口-上海路隧道穿越薄富含水层冻结法止水加固方案,利用ADINA有限元软件对该浅埋暗挖隧道涌水段建立冻结温度场数值模型,分析了冻结管间距、冻结盐水温度、冻结管直径对冻结壁发展速率、冻结壁厚度、平均温度的影响,以此为基础对冻结参数开展优化设计,并获得成功应用。研究结果表明:利用人工冻结技术能够有效解决这一特殊岩土工程难题。为了在支护段获得有效地止水冻土帷幕,冻结管间距应小于等于1 m;冻结工程中采取-30℃的盐水温度既能满足需冷量,又能符合经济性要求;采取大直径的冻结管对增加冻土墙厚度与降低冻土壁平均温度的影响并不显著。

关 键 词:隧道内人工冻结  浅埋暗挖  薄含水层  温度场  数值模拟  
收稿时间:2010-04-23

Study of thermal field of soil freezing in shallow covered tunnel with subsurface excavation passing through ground with thin aquifer under complex conduction
YUAN Yun-hui,YANG Ping,JUANG Tian-qian. Study of thermal field of soil freezing in shallow covered tunnel with subsurface excavation passing through ground with thin aquifer under complex conduction[J]. Rock and Soil Mechanics, 2010, 31(Z1): 388-393
Authors:YUAN Yun-hui  YANG Ping  JUANG Tian-qian
Affiliation:1. College of Civil Engineering, Nanjing Forestry University, Nanjing 210037, China; 2. Second Department of China Railway Tunneling Group Corporation, Beijing 102200, China
Abstract:Artificial freezing water sealing reinforcement method for water-enriching layers of Shang-Xin tunnel of Nanjing metro Line No.2 is proposed. Numerical model of freezing temperature field is built for the water inflowing tunnel by ADINA software. The effects of distance of freezing pipes, brine temperature and diameter of freezing pipes on development of freezing walls, thickness of freezing wall and average temperature are studied. On the basis of this study optimization design is implemented. And the freezing method is successfully applied to the construction. The study demonstrates that the application of artificial freezing can solve this special geotechnical problem. The distance of freezing pipes should less than 1 meter so as to get effective freezing wall. Using brine temperature of -30℃ may not only meet the need of cooling capacity but also meet the economical requirement. There is no significant effect on the thickness of freezing wall and the average temperature by using freezing pipes of large diameter.
Keywords:artificial freezing in tunnel  shallow covered tunnel with subsurface excavation  thin aquifer  temperature field  numerical simulation
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号