首页 | 本学科首页   官方微博 | 高级检索  
     

基岩标的施工技术探讨与实践
引用本文:严一华,汪拾金. 基岩标的施工技术探讨与实践[J]. 探矿工程, 2012, 39(3): 55-58
作者姓名:严一华  汪拾金
作者单位:浙江省岩土基础公司,浙江宁波315040
摘    要:基岩标是指在覆盖有松散地层的区域内为更准确测定地面沉降量,穿过覆盖层埋设在稳定基岩卜的标杆直通地面,经过保护处理作为相对稳定的基岩水准点。具有标孔要求高、基岩面判层准确、标杆安装要求高等特点。通过浙江省宁波市2座基岩标施工的实践,探讨了确保基岩标质量的关键技术和控制措施,对实际施工有一定的参考作用。

关 键 词:基岩标  标孔  标杆  地而沉降监测
收稿时间:2011-12-23
修稿时间:2011-12-23

Discussion of Construction Technique of Bedrock Bench Mark and the Practice
YAN Yi-hua and WANG Shi-jin. Discussion of Construction Technique of Bedrock Bench Mark and the Practice[J]. Exploration Engineering:Rock & Soil Drilling and Tunneling, 2012, 39(3): 55-58
Authors:YAN Yi-hua and WANG Shi-jin
Affiliation:( Zhejiang Geotechnical Foundation Co. , Ningbo Zhejiang 315040, China)
Abstract:Bedrock bench mark is a buried pole across the loose overburden layer to the stable bedrock for the accurate mo- nitoring of land subsidence, which is with the characteristics of high requirement on mark hole and mark pole construction and accurate bedrock surface deciding. Based on the practice of 2 bedrock bench mark construction in Ningbo, discussion was made on the key technologies and control measures to ensure the quality of bedrock bench mark.
Keywords:bedrock bench mark  mark hole  mark pole  land subsidence monitoring
本文献已被 维普 等数据库收录!
点击此处可从《探矿工程》浏览原始摘要信息
点击此处可从《探矿工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号