南京奥体中心主轴线的测设
引用本文:高俊强,许耀东.南京奥体中心主轴线的测设[J].测绘工程,2006,15(3):64-66,73.
作者姓名:高俊强  许耀东
作者单位:南京工业大学,土木工程学院,江苏,南京,210009;南京工业大学,土木工程学院,江苏,南京,210009
摘    要:结合南京奥体中心主轴线的测设实践介绍了一种不同于常规的归化法轴线测设方法,结合测量误差理论对该方法进行了精度分析,给出了相应的精度估算式,通过工程实例的具体数据说明该方法具有较高的归化精度。

关 键 词:主轴线  控制网  归化
文章编号:1006-7949(2006)03-0064-03
收稿时间:2006-01-14
修稿时间:2006-01-14

The setting out of main axes of Nanjing Olympic Gym Center
GAO Jun-qiang,XU Yao-dong.The setting out of main axes of Nanjing Olympic Gym Center[J].Engineering of Surveying and Mapping,2006,15(3):64-66,73.
Authors:GAO Jun-qiang  XU Yao-dong
Institution:Dept. of Civil Engineering, Nanjiang University of Technology, Nanjing 210009, China
Abstract:Firstly,it introduces a setting out method of naturalization axes by the practice of setting out the main axes of Nanjing Olynpic Gymnasium Center.This method is not a rule one.Secondly,it gives a precision analysis to the method by the theory of survey error,and gives corresponding equation of precision computation.Finally, it indicates that the method has upper naturalization precision according concrete data of engineering example.
Keywords:main axes  control network  naturalization