首页 | 本学科首页   官方微博 | 高级检索  
     检索      

昆仑山隧道洞内防排水及衬砌隔热保温层施工技术
引用本文:周晋筑.昆仑山隧道洞内防排水及衬砌隔热保温层施工技术[J].冰川冻土,2003,25(1):106-111.
作者姓名:周晋筑
作者单位:中铁五局青藏铁路指挥部, 青海, 格尔木, 816000
摘    要:介绍了高原多年冻土世界第一长隧道——昆仑山隧道洞内防排水及衬砌隔热保温层的设计特点, 通过材料性能优选和工艺试验, 选定了适宜于高原多年冻土隧道洞内防排水及衬砌隔热保温层施工的材料, 并制定科学、合理的施工方法和工艺, 确保昆仑山隧道工程质量.

关 键 词:青藏铁路  多年冻土  隧道  防排水  隔热保温层  施工技术  
文章编号:1000-0240(2003)01-0106-06
收稿时间:2002-11-07
修稿时间:2002年11月7日

Constructing Technology Research on Water-proof/Drain age and Heat Insulation Lining in Kunlunshan Tunnel of Qinghai-Tibet Railway, Ti betan Plateau
ZHOU Jing-zhui.Constructing Technology Research on Water-proof/Drain age and Heat Insulation Lining in Kunlunshan Tunnel of Qinghai-Tibet Railway, Ti betan Plateau[J].Journal of Glaciology and Geocryology,2003,25(1):106-111.
Authors:ZHOU Jing-zhui
Institution:The Command Post of China Railway Wuju Corporation for Qinghai-Tibet Railway Construction, Ge’ermu Qinghai 816000, China
Abstract:Kunlunshan Tunnel on Qinghai-Tibet Railway, 1686m in length, the world longest permafrost tunnel on plateau (4600~4800 m in elevation), is situated in permafrost region. Because of its special geography, harsh nature environment and complicated geological condition, water-proof/drainage and heat insulation for the tunnel are highly demanded. However, no successful experience for water|proof/drainage and heat insulation in such tunnels can be founded both at home and abroad, since the conventional methods cannot meet the needs of the tunnel construction. Hence, it becomes a typical and key structure for the design, construction technology and quality control. In this paper, the design characteristic of water-proof/drainage and heat insulation for plateau permafrost tunnel is put forward, which is laid between the initial lining supporting and final lining supporting with a structure of "compound water-proof plate plus heat insulation plate plus compound water-proof plate". In order to ensure good quality of the tunnel, heat insulation materials like non-woven cloth and /PVC compound water-proof plate, PU polyurethane plate, type TN-1 polyurethane adhesion agent, OP resin emulsion are selected as the lining material for water-proof/drainage and heat insulation. They are frequently tested and selected in accordance with the needs and requirements of construction of plateau permafrost tunnel. In order to get an ideal result of water-proof and heat insulation, with no nails, water-proof plates are double-seams welded with thermo-welder, and heat insulation plates are sticked together with type TN-1 polyurethane adhesion agent. As reasonable construction method and technology such as water-proof/drainage and heat insulation lining is adopted in this tunnel, the quality of tunnel construction is guaranteed.
Keywords:Qinghai-Tibet Railway  permafrost  tunnel  water-proof/drainage  heat insulating layer  construction technology
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《冰川冻土》浏览原始摘要信息
点击此处可从《冰川冻土》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号