North east pacific time-integrated undersea networked experiments (NEPTUNE): cable switching and protection |
| |
Authors: | El-Sharkawi MA Upadhye A Shuai Lu Kirkham H Howe BM McGinnis T Lancaster P |
| |
Institution: | Dept. of Electr. Eng., Univ. of Washington, Seattle, WA, USA; |
| |
Abstract: | The objective of the North East Pacific Time-Integrated Undersea Networked Experiments (NEPTUNE) is to establish a permanent, subsea observatory surrounding the Juan de Fuca tectonic plate. To achieve this objective, a special power distribution system is designed to provide continuous power to science equipment, vehicles, and laboratories located as deep as 5 km below the water surface. The NEPTUNE power system is significantly different from terrestrial power systems in many aspects and it requires different switching, protection, and control strategies. In this paper, we address the design of system switching and fault isolation equipment. |
| |
Keywords: | |
|
|