首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Influence of the ore block model estimation on the determination of the mining cutoff grade policy for sustainable mine production
Authors:Atac Bascetin  Serkan Tuylu  Antonio Nieto
Institution:(1) Mining Engineering Department, Istanbul University, Avcilar, Istanbul, Turkey;(2) Mining Engineering, Penn State University, University Park, PA, USA;
Abstract:Strategic mine planning includes different cut-off grade policy depending on economic parameters of mining projects and grade–tonnage distribution of the deposit. Minimizing incorrect classification of ore and waste during grade–tonnage distribution is of critical importance for a mining operation. This article reviews the influence of the ore grade–tonnage distribution over the cut-off grade policy in a given mining operation. In this study, firstly, the interpolation parameters used to characterize the grade–tonnage distribution in the orebody are given. The resulting distribution of ore and waste is used to analyze uncertainty, risk impact, and to justify mine-planning decisions, according to the interpolation technique used and the number of geological settings and sampling scenarios being considered. Then, the working scheme of the cut-off grade policy and economic parameters are compared according to the resulting estimation from the inverse distance and the nearest neighbor methods.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号