首页 | 本学科首页   官方微博 | 高级检索  
     

大口径三维曲线顶管顶力估算及实测分析
引用本文:陈孝湘,张培勇,丁士君,唐自强. 大口径三维曲线顶管顶力估算及实测分析[J]. 岩土力学, 2015, 36(Z1): 547-552. DOI: 10.16285/j.rsm.2015.S1.095
作者姓名:陈孝湘  张培勇  丁士君  唐自强
作者单位:1. 福建省电力勘测设计院,福建 福州 350003;2. 中国电力科学研究院,北京100192;3. 国网福建省电力有限公司经济技术研究院,福建 福州 350003
基金项目:中国电力建设股份有限公司科技项目(No.DJ-ZDXM-2014-28);福建省电力有限公司科技项目(科2012-066)。
摘    要:顶管顶进阻力由顶管机的迎面阻力和管节与土体间的摩阻力两部分组成,现有的顶力估算公式都具有一定的适用条件,虽然物理意义明确,但参数取值范围较大,往往估算顶力与实际工程顶力的匹配程度较低,尤其是在三维曲线顶管工程中受曲线段的影响,准确估算顶力的难度更大。以长413.0 m,外径为3.8 m,最小曲率半径为313.7 m的三维曲线顶管工程为研究对象,基于现有的顶力公式估算所需顶力大小并布设中继间,在该工程实测数据的基础上分析顶力组成及其与顶程、顶进曲率半径等影响因素之间的关系和顶管在平面曲线和垂直剖面曲线以不同曲率半径顶进的摩阻力变化规律。分析结果显示,曲线顶管摩阻力附加系数是真实存在的,且工程实测值与经验值有所偏差,但顶管在淤泥或黏土层中顶进时的摩阻力按规程推荐取值能够满足工程实践需求。最后提出了顶力估算及中继间的布置建议,为类似工程提供依据。

关 键 词:长距离  大直径  三维曲线顶管  顶力估算  实测分析  
收稿时间:2015-03-10

Jacking force estimation and measured data analysis of 3D curved long distance and large diameter pipe jacking
CHEN Xiao-xiang,ZHANG Pei-yong,DING Shi-jun,TANG Zhi-qiang. Jacking force estimation and measured data analysis of 3D curved long distance and large diameter pipe jacking[J]. Rock and Soil Mechanics, 2015, 36(Z1): 547-552. DOI: 10.16285/j.rsm.2015.S1.095
Authors:CHEN Xiao-xiang  ZHANG Pei-yong  DING Shi-jun  TANG Zhi-qiang
Affiliation:1. Fujian Electric Power Survey & Design Institute, Fuzhou, Fujian 350003, China; 2. China Electric Power Research Institute, Beijing 100192, China;3. State Grid Fujian Electric Power Co., Ltd., Fuzhou, Fujian 350003, China
Abstract:This paper presents the estimation and measured data analysis of the jacking force of a 3D curved pipe with 3.8 meter external diameter and 413 meter long distance. The jacking force consists of the face load and friction resistance; and it is influenced by many factors. The most widely used estimation methods of the jacking force include Chinese cord method; Japanese method and German method; but they all have specific application conditions, which make them have limitations for engineering application; especially when the friction resistance factors are offered by a wide interval. The jacking force are calculated by the above estimation methods in a 3D curved, 413 meter long distance and 3.8 meter external diameter jacking project, 3 intermediate jacking stations are set according to the calculation results. According to the site measuring data during the construction procedure, the composition of the jacking load and its relationship with the jacking distances and the curve radius are analyzed; and the site measured values of frictional coefficient are offer in table. Base on the analysis results, additional frictional coefficient of axis curve pipe jacking is truly exist, and there are deviations between the cord recommended values and the site measured values. but according to this project, the cord recommended values could meet the demands of scheme design in clay or in silt clay. At the end of this paper, suggestions of the jacking force estimation and intermediate jacking station arrangement are proposed, which provide references for similar construction.
Keywords:long distance  large diameter  3D curved pipe jacking  jacking force estimate  site measuring  
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号