首页 | 本学科首页   官方微博 | 高级检索  
     检索      

Stability analysis on Jinjia dam hydropower project in Chongqing City
作者姓名:Fuzhi  XIE  Hong  FENG  Xiaohan  YANG  Jingzong  YU
作者单位:Institute of Northeast Hydroelectric Investigation Design, Changchun 130062, China
摘    要:The stability analysis is one of the chief problems at hydropower stations.The Jinjia Hydropower Station is a significant project in Southwest China.The paper adopts the rigidity limited equilibrium theory and evaluated stability of the slope body,which will provide the evidences for further detail design.

关 键 词:长春  水电站  水利设计  稳定性
文章编号:1673-9736(2006)02-0246-03

Stability analysis on Jinjia dam hydropower project in Chongqing City
Fuzhi XIE Hong FENG Xiaohan YANG Jingzong YU.Stability analysis on Jinjia dam hydropower project in Chongqing City[J].Journal of Geoscientific Research in Northeast Asia,2006,9(2):246-248.
Authors:Fuzhi XIE  Hong FENG  Xiaohan YANG and Jingzong YU Institute of Northeast Hydroelectric Investigation Design  Changchun  China
Institution:Fuzhi XIE,Hong FENG,Xiaohan YANG and Jingzong YU Institute of Northeast Hydroelectric Investigation Design,Changchun 130062,China
Abstract:The stability analysis is one of the chief problems at hydropower stations. The Jinjia Hydropower Station is a significant project in Southwest China. The paper adopts the rigidity limited equilibrium theory and evaluated stability of the slope body, which will provide the evidences for further detail design.
Keywords:stability analysis  hydropower project  Jinjia Hydropower Station
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号