首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Speedup of post earthquake community recovery: the case of precast industrial buildings after the Emilia 2012 earthquake
Authors:F Braga  R Gigliotti  G Monti  F Morelli  C Nuti  W Salvatore  I Vanzi
Institution:1. University of Rome La Sapienza, Rome, Italy
2. University of Pisa, Pisa, Italy
3. University of Rome 3, Rome, Italy
4. University of Chieti-Pescara, Pescara, Italy
Abstract:The Emilia, May–July 2012, earthquake hit a highly industrialized area, where some tens thousands industrial buldings, mainly single storey precast structures, are located. Due to the likelihood of strong after shocks and the high vulnerability of these structures, the authorities first asked for a generalized seismic retrofit after the strong shakings of May 20th. In order to accelerate community recovery, this requirement was later loosened, leaving out the buildings which had undergone a strong enough shaking without any damage; the strong enough shaking was defined with reference to the ultimate limit state design earthquake. To the authors’ knowledge, it is the first time that the information on the earthquake intensity and structural damage is used for such a large scale post earthquake simplified safety assessment. In short, the earthquake was used as large experimental test. This paper shows the details of the models and computations made to identify the industrial buildings which have been considered earthquake tested and therefore not compelled to mandatory seismic retrofit. Since earthquake indirect (e.g. due to economic halt) costs may be as large the direct ones, or even larger, it is believed that this method may considerably lower the earthquake total costs and speed up the social and economic recovery of a community.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号