双圆盾构隧道施工中压重纠偏效果分析
引用本文:蔡丰锡,沈水龙,张兆逵,白廷辉.双圆盾构隧道施工中压重纠偏效果分析[J].岩土力学,2007,28(8):1691-1694.
作者姓名:蔡丰锡  沈水龙  张兆逵  白廷辉
作者单位:1. 上海交通大学 土木工程系,上海 200030;2. 上海市基础工程公司盾构分公司,上海 200433;3. 上海申通集团有限公司,上海 200030
摘    要:在双圆盾构隧道施工过程中双圆盾构往往会由于以下因素发生侧向偏转:(1)土层分布不均匀;(2)盾构机的制造误差;(3)运输台车的牵引力的不同;(4)已拼装管片的作用;(5)注浆的流失;(6)施工中的不当操作。首先,分析了双圆盾构施工中产生偏转的原因以及纠偏方法,其中单侧压重是纠正双圆盾构侧向偏转的最为简单经济有效的方法。在工程实践中,压重荷载的大小一般取决于操作人员的经验和现场观测偏转角的变化。在单侧压重实施前没有预测其纠偏效果的方法,而且,压重纠偏还会引起周围地层的变位。应用有限元数值模拟的方法,分析总结了压重荷载与偏转角的关系以及双圆盾构周围土层的变形。对于最大允许偏转角为0.6°时,需加压重荷载为350 kN将其纠正。同时,纠偏0.6°偏转角会造成85 mm的额外地表沉降,其结果可供实际工程的施工管理参考。

关 键 词:双圆盾构  滚动偏转  单侧压重  压重效果  有限单元法  沉降  
文章编号:1000-7598-(2007)08-1691-04
收稿时间:2005-08-27
修稿时间:2005-08-27

Effect of single side loading on Double-O-Tube shield rolling control
CAI Feng-xi,SHEN Shui-long,ZHANG Zhao-kui,BAI Ting-hui.Effect of single side loading on Double-O-Tube shield rolling control[J].Rock and Soil Mechanics,2007,28(8):1691-1694.
Authors:CAI Feng-xi  SHEN Shui-long  ZHANG Zhao-kui  BAI Ting-hui
Institution:1. Department of Civil Engineering, Shanghai Jiaotong University, Shanghai 200030, China; 2. Shanghai Foundation Engineering Co. Ltd., Shanghai 200433, China; 3. Shanghai ShenTong Inc., Shanghai 200030, China
Abstract:During double-o-tube DOT tunnel construction,rolling will inevitably occur due to the following reasons: different subsoil condition;manufacturing errors of machine;different pull forces at the two sides;effect of assembled segments;loss of grouts;and operation problems.Several countermeasures to correct rolling have been proposed.Loading using lead block at the elevated side is the most easy and economic method.In engineering practice,the weight of loading is determined by the experience of operating workers and/or through the observation of returned rolling angle.There is no prediction method before loading applying.Moreover,loading correction will also cause additional movement of surrounding ground.This paper analyzes the weight-correcting angle relation and deformation around DOT shield by employing FEM.For the allowable angle of 0.6 degree,the applied load should be 350 kN.Correcting 0.6 degree causes about 85 mm of additional surface settlement.These results can give a guide to the construction management.
Keywords:DOT shield  rolling  single side loading  effect of loading  finite element method  settlement