外滩防汛墙二期工程防御能力分析 |
| |
作者姓名: | 程徽丰 陈宝 |
| |
作者单位: | 上海防汛墙建设管理处,上海;同济大学,上海 |
| |
基金项目: | 上海市重点学科(岩土工程)建设基金资助 |
| |
摘 要: | 该文依据外滩防汛墙多年的沉降观察资料,对外滩防汛墙由地面沉降和结构沉降而出现的防汛能力降低的问题进行研究。综合结构沉降与地面沉降因素,分析了1984年和2002年黄浦江潮位标准下外滩防汛墙二期现有防御能力及其下降趋势。
|
关 键 词: | 防汛墙 沉降 防御能力 |
修稿时间: | 2004年9月9日 |
Phase of Flood Prevention Capability of the 2nd Flood- Control Wall Along the Bund |
| |
Authors: | Cheng Hui-Feng CHEN Bao |
| |
Abstract: | The authors studied on the influence of structural settlement and ground subsidence on the flood-prevention capability of flood-control wall. Combining the settlement with subsidence, the flood-prevention capability of the flood-control wall at present and in the future was analyzed and valued based on the tide levels respectively in 1984 and 2002. |
| |
Keywords: | flood-control wall settlement flood-prevention capability |
本文献已被 CNKI 维普 万方数据 等数据库收录! |