首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Estimation of water renewal times for the middle and lower sections of the Yellow River
Authors:Lüliu Liu  Zhifeng Yang  Zhenyao Shen
Abstract:Replacement of water in a given hydrological component is one of the effects of the hydrological cycle. We introduce the concept of renewal time to express the rate of water replacement in a specific reach of a river. Based on stream‐flow data from the 1990s, a simple formula is used to estimate renewal times for several reaches in the middle and lower sections of the Yellow River (Huanghe) in China. These estimates reveal the following trends: (i) renewal times are shortest during the May–October period and (ii) annual renewal times tend to decrease when moving downstream from the middle to lower reaches. Copyright © 2003 John Wiley & Sons, Ltd.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号