首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Analysis and Research on Blasting Network Delay of Deep-Buried Diversion Tunnel Crossing Fault Zone Based on EP-CEEMDAN-INHT
Authors:Wu  Jing  Wu  Li  Sun  Miao  Lu  Ya-ni  Han  Yan-hua
Institution:1.Faculty of Civil Engineering, Hubei Engineering University, Xiaogan, 432000, China
;2.Faculty of Engineering, China University of Geosciences, Wuhan, 430074, China
;3.College of Environment and Engineering, Hubei Land Resources Vocational College, Wuhan, 430090, China
;
Abstract:Geotechnical and Geological Engineering - The Empirical Mode Decomposition (EMD) of blasting seismic wave monitoring signal with noise can get IMFs with serious modal confusion and endpoint...
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号