首页 | 本学科首页   官方微博 | 高级检索  
     


Drilling and Grouting Works for Pressurised Groundwater Conditions of the Semmering Base Tunnel
Authors:Wannenmacher  Helmut  Entfellner  Manuel  Hauer  Hannes
Abstract:Geotechnical and Geological Engineering - The Semmering Base Tunnel (SBT), with a total length of 27.3 km, is one of the leading construction projects of the Baltic-Adriatic Railway...
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号