GPS real-time supervisory system and application in the construction of face rockfill dam |
| |
Authors: | Huang Shengxiang Liu Jingnan Zeng Huai’en |
| |
Institution: | (1) School of Geodesy and Geomatics, Wuhan University, 129 Luoyu Road, 430079 Wuhan, China |
| |
Abstract: | According to the quality control needs of filling construction of the face rockfill dam, by means of the global satellite positioning technology, the wireless data communication technology, the computer technology and the data processing and analysis technology, and integrating with the roller compaction machine, the GPS real-time supervisory system is developed in this paper. It can be used to real-timely supervise the construction quality of the roller compaction for filling engineering. The composition and applied characteristics of GPS system, and the key technique problem and solution of the design are discussed. The height accuracy of GPS system is analyzed and the preliminary application is introduced. |
| |
Keywords: | GPS filling construction quality control integrated system face rockfill dam |
本文献已被 CNKI 维普 万方数据 SpringerLink 等数据库收录! |
|