The displacement computation and construction pre-control of a foundation pit in Shanghai utilizing FEM and intelligent methods |
| |
Authors: | You-Liang Chen Rafig Azzam Fu-Bo Zhang |
| |
Institution: | (1) Department of Civil Engineering, Shanghai University, 200072 Shanghai, PR China;(2) Department of Engineering Geology and Hydrogeology, RWTH-Aachen University, 52064 Aachen, Germany |
| |
Abstract: | Controlling the displacements of foundation pit walls and supporting structures is one of the most effective measures for
ensuring safety of foundation pit construction. Because of this, the accurate displacement computation of foundation pit walls
and supporting structures is paid great attention by geotechnical scientists and engineers. In this paper, the three-dimensional
displacement field of Deping Station foundation pit, which is part of Shanghai Track Traffic Line 6 project, is computed by
means of ANSYS software. Artificial neural networks (ANNs) are a broad category of computer algorithms which have the ability
to learn some target values (desired output) from a set of chosen input data that has been introduced to the network. The
ANNs have very excellent ability in simulating nonlinear and complicated problems. In the current paper, the authors try to
combine FEM method with ANNs so as to improve the computational accuracy. Basing on the computed results, fuzzy control theory
is applied to construction pre-control. The application effect is satisfactory. The research result of current paper is very
helpful for geotechnical construction and the development of geotechnical theory. |
| |
Keywords: | foundation pit FEM method artificial neural networks fuzzy logic construction pre-control |
本文献已被 SpringerLink 等数据库收录! |
|