首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Satellite-based technique for nowcasting of thunderstorms over Indian region
Authors:Suman Goyal  Ashish Kumar  M Mohapatra  L S Rathore  S K Dube  Rahul Saxena  R K Giri
Institution:1.India Meteorological Department,New Delhi,India;2.Amity University,Jaipur,India
Abstract:India experiences severe thunderstorms during the months, March–June. But these systems are not predicted well, mainly due to the absence of mesoscale observational network over Indian region and the expert system. As these are short lived systems, the nowcast is attempted worldwide based on satellite and radar observations. Due to inadequate radar network, satellite plays the dominant role for nowcast of these thunderstorms. In this study, a nowcast based algorithm ForTracc developed by Vila et al. (Weather Forecast 23:233–245, 2008) has been examined over the Indian region using Infrared Channel \((10.8~\upmu \hbox {m})\) of INSAT-3D for prediction of Mesoscale Convective Systems (MCS). In this technique, the current location and intensity in terms of Cloud Top Brightness Temperature (CTBT) of the MCS are extrapolated. The purpose of this study is to validate this satellite-based nowcasting technique for Convective Cloud Clusters that helps in optimum utilization of satellite data and improve the nowcasting. The model could predict reasonably the minimum CTBT of the convective cell with average absolute error (AAE) of \({<}7\hbox { K}\) for different lead periods (30–180 min). However, it was underestimated for all the lead periods of forecasts. The AAE in the forecasts of size of the cluster varies from about \(3\times 10^{4}\hbox { km}^{2}\) for 30-min forecast to \(7\times 10^{4}\hbox { km}^{2}\) for 120-min forecast. The mean absolute error in prediction of size is above 31–38% of actual size for different lead periods of forecasts from 30 to 180 min. There is over estimation in prediction of size for 30 and 60 min forecasts (17% and 2.6% of actual size of the cluster, respectively) and underestimation in 90 to 180-min forecasts (–2.4% to –28%). The direct position error (DPE) based on the location of minimum CTBT ranges from 70 to 144 km for 30–180-min forecast respectively.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号