大同市某变电站下伏采空区的注浆加固治理
引用本文:卢锋. 大同市某变电站下伏采空区的注浆加固治理[J]. 探矿工程, 2014, 41(12): 68-73,74
作者姓名:卢锋
作者单位:山西省地质勘查局217地质队,山西大同037008
摘    要:通过对大同市某变电站下伏采空区治理的实例,介绍了采空区治理方法的选择和实施过程,探讨了采空区注浆加固治理工程设计理念,总结了施工过程中各种问题的解决方法和成功经验。

关 键 词:采空区  治理方法  注浆加固
收稿时间:2014-11-17
修稿时间:2014-11-28

Grouting Reinforcement for Mined-out Area Underlying Substation in Datong
LU Feng. Grouting Reinforcement for Mined-out Area Underlying Substation in Datong[J]. Exploration Engineering:Rock & Soil Drilling and Tunneling, 2014, 41(12): 68-73,74
Authors:LU Feng
Affiliation:LU Feng ( 217 Geological Team, Shanxi Province Baream of Geology Exploration, Datong Shanxi 037008, China)
Abstract:Based on the case of the treatment for mined-out area underlying a substation in Datong, the paper introduces the selection and implementation processes of the treatment methods for mined-out area treatment, discusses the design idea of the grouting reinforcement engineering and summarizes the solutions for various difficulties encountered in the construction with the successful experience presented.
Keywords:mined-out area  treatment method  grouting reiforcement