Elastoplastic consolidation above and beneath strip anchors under uplift forces |
| |
Authors: | Vikram Singh |
| |
Affiliation: | 1. Department of Civil Engineering, Malaviya National Institute of Technology, Jaipur, India;2. Department of Civil Engineering, Indian Institute of Technology Bombay, Powai, Mumbai, India |
| |
Abstract: | Although the uplift behavior of offshore plate anchors under undrained conditions has been investigated well in the past, studies on the behavior of anchors under long-term sustained loading are in relatively few numbers. The time required for consolidation under sustained load is important because the shear strength of soil changes after dissipation of excess pore pressure. In this paper, small strain finite-element analyses have been performed to investigate the consolidation time history above and beneath strip anchors. The modified cam clay plasticity constitutive model is used for modeling coupled pore fluid stress analysis. The effects of magnitude of preloading with embedment level have been studied. As expected, the FE results have shown that excess pore pressure dissipation time for soil above the anchor increased with the increase in embedment depth and the magnitude of preload. Rapid dissipation of negative excess pore pressure beneath the anchor was observed with increasing embedment depth, if the preload magnitude is equal to or more than 60% of the undrained capacity. Observed consolidation responses are presented as nondimensional design charts and simplified equations for ease of practice. |
| |
Keywords: | Anchor consolidation finite element modeling offshore engineering |
|
|