首页 | 本学科首页   官方微博 | 高级检索  
     检索      

青藏铁路多年冻土区钻孔桩基础个别问题探讨及设计对策
引用本文:高翰青.青藏铁路多年冻土区钻孔桩基础个别问题探讨及设计对策[J].冰川冻土,2004,26(Z1):194-196.
作者姓名:高翰青
作者单位:The First Railway Survey and Design Institute, Lanzhou Gansu 730000, China;
摘    要:Part of soil around cast-in-place pile will thaw because the heat of hydration produced by concrete during construction. In this paper soil upfreezing action to pile during refreezing process is analyzed, and the measures to the action are put forward. Furthermore, soil frictional forces to pile due to the thawing of part of soil around pile and the slowness of refreezing after construction is discussed and a rational method is suggested.

关 键 词:cast-in-place  pile  refreezing  of  soil  upfreezing  action  drill  frictional  pile  青藏铁路  多年冻土区  钻孔  桩基础  个别问题  设计对策  Regions  Permafrost  Railway  Problems  Pile  Foundation  forces  thawing  slowness  during  construction  rational  method  measures  upfreezing  action  forward

Discussions and Measures to Several Drill Pile Foundation Problems of the Qinghai-Tibet Railway in Permafrost Regions
GAO Han-qing.Discussions and Measures to Several Drill Pile Foundation Problems of the Qinghai-Tibet Railway in Permafrost Regions[J].Journal of Glaciology and Geocryology,2004,26(Z1):194-196.
Authors:GAO Han-qing
Abstract:Part of soil around cast-in-place pile will thaw because the heat of hydration produced by concrete during construction. In this paper soil upfreezing action to pile during refreezing process is analyzed, and the measures to the action are put forward. Furthermore, soil frictional forces to pile due to the thawing of part of soil around pile and the slowness of refreezing after construction is discussed and a rational method is suggested.
Keywords:cast-in-place pile  refreezing of soil  upfreezing action  drill frictional pile
本文献已被 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号