首页 | 本学科首页   官方微博 | 高级检索  
     检索      

对我国新旧重力系统转换的几点意见
引用本文:江志恒,刘乃苓.对我国新旧重力系统转换的几点意见[J].测绘科学,1990(2).
作者姓名:江志恒  刘乃苓
作者单位:国家测绘局测绘科学研究所 (江志恒),国家测绘局测绘科学研究所(刘乃苓)
摘    要:本文提出了我国新旧重力系统实施转换的三种方法。其中平差法理论严谨,充分顾及了重力系统差异的物理意义,并可获得足够的信息,以估算旧网的实际精度;插值法为实地转换,系统转换误差小,计算简便,是较理想的实用模型;回归法是两套系统的平滑拟合,采用全国统一的转换模型,计算工作量最小。三种方法亦可结合使用。


Some Remarks on the Transformation between the Previous and Present Gravimetric System
Abstract:Three methods are suggested for the transformation between thePrevious and Present gravimetric system:Adjustment method is basedon error theory taking fully the Physical signification of gravimetric system into account and can give useful information for estimation ofthe Previous net′s accuracy;Interperlation method is of“real”transfo-rmation,and gives little transforming error to gravity.it is then aPracticiable modle;Regression method gives the Smoothing resolu-tion and a homogeneous formnla for the wuhole country′s transformingcomputation.The three can of canse be Performed commonly.
Keywords:
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号