首页 | 本学科首页   官方微博 | 高级检索  
     

数字摄影测量采集岩体结构面信息的控制测量方法
引用本文:胡瀚,王凤艳,王明常,卢立吉,李启源. 数字摄影测量采集岩体结构面信息的控制测量方法[J]. 世界地质, 2018, 37(1): 309-315. DOI: 10.3969/j.issn.1004-5589.2018.04.031
作者姓名:胡瀚  王凤艳  王明常  卢立吉  李启源
作者单位:吉林大学地球探测科学与技术学院, 长春 130026
基金项目:国家自然科学基金面上项目(41472243).
摘    要:以吉林省长春市净月潭附近的废弃采石场为研究对象,开展了基于数字摄影测量的边坡结构面信息采集的控制测量研究。控制测量分级布设:首级平面控制采用一级导线测量,高程控制采用全站仪对向三角高程法和全站仪垂距测量法,通过对比两种方法的观测结果,发现在一些地形起伏较大的地区,全站仪垂距测量法可以满足高程控制测量的精度,而且方便快捷,同时探讨了GPS-RTK控制测量在数字摄影测量中的应用;次级坡面控制采用空间极坐标测量法。通过控制测量,可以为边坡结构面信息的摄影测量获取提供准确、可靠的基准。

关 键 词:控制测量  数字摄影测量  全站仪垂距测量法  导线测量  GPS-RTK测量
收稿时间:2017-02-20
修稿时间:2017-11-02

Control survey for rock discontinuity information acquisition by digital photogrammetry
HU Han,WANG Feng-yan,WANG Ming-chang,LU Li-ji,LI Qi-yuan. Control survey for rock discontinuity information acquisition by digital photogrammetry[J]. Global Geology, 2018, 37(1): 309-315. DOI: 10.3969/j.issn.1004-5589.2018.04.031
Authors:HU Han  WANG Feng-yan  WANG Ming-chang  LU Li-ji  LI Qi-yuan
Affiliation:College of Geo-exploration Science and Technology, Jilin University, Changchun 130026, China
Abstract:Taking the abandoned quarry near Jingyuetan in Changchun City, Jilin as the research object, the control measurement of slope structural plane information collection based on digital photogrammetry has been carried out.The classification layout method of control measurement is as shown in the following:the first level of plane control uses the first-order traverse survey; elevation control uses the total station to the triangle elevation method and the total station vertical distance measurement method.By comparing the results of the two methods, it is found that in some areas with large terrain ups and downs, the total station vertical distance measurement method can meet the accuracy of elevation control measurement, and it is convenient and quick.At the same time, the application of GPS-RTK control measurement in digital photogrammetry is discussed.Secondary slope control uses spatial polar coordinate measurement method. By controlling the measurement, it is possible to provide accurate and reliable benchmarks for photogrammetric acquisition of slope structural plane information.
Keywords:control survey  digital photogrammetry  total station vertical distance measurement  traverse survey  GPS-RTK surveying
本文献已被 CNKI 等数据库收录!
点击此处可从《世界地质》浏览原始摘要信息
点击此处可从《世界地质》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号