首页 | 本学科首页   官方微博 | 高级检索  
     检索      

震后重建项目中基于灰色模型构建的多因素造价控制模型
引用本文:郭彦丽,侯云飞.震后重建项目中基于灰色模型构建的多因素造价控制模型[J].西北地震学报,2019,41(1):215-220.
作者姓名:郭彦丽  侯云飞
作者单位:宜宾职业技术学院 建筑工程系, 四川 宜宾 644000,长沙理工大学 交通运输工程学院, 湖南 长沙 410004
基金项目:国家自然科学基金(51078045)
摘    要:在当前震后重建项目的多因素造价控制过程中,未考虑造价影响因素造成的偏差,导致控制精度较低,因此需对震后重建项目中基于灰色模型构建的多因素造价控制模型进行研究。从重建项目的造价影响因素入手,分析由于震后重建项目管理程序缺位造成的进度偏差,因为设计能力影响造成的质量偏差以及因建筑材料市场供求状况不稳定造成的价格偏差,计算各影响因素造成的偏差系数,求解得出更为精确的重建项目整体偏差结果。结合灰色模型构建造价控制约束函数,并进行求解,进而完成震后重建项目中多因素造价控制模型的构建。实验结果表明,所构建模型的精确度较高,且与实际值偏离程度小,可信度较高。可以对重建项目进行全方位的动态管理,降低工程成本。

关 键 词:震后  灰色模型  重建项目  多因素造价  控制  偏差
收稿时间:2018/7/28 0:00:00

Multi-factor Model Based on the Gray Model for the CostControl of Post-earthquake Reconstruction Projects
GUO Yanli and HOU Yunfei.Multi-factor Model Based on the Gray Model for the CostControl of Post-earthquake Reconstruction Projects[J].Northwestern Seismological Journal,2019,41(1):215-220.
Authors:GUO Yanli and HOU Yunfei
Institution:Department of Architectural Engineering, Yibin Vocational and Technical College, Yibin 644000, Sichuan, China and School of Traffic and Transportation Engineering, Changsha University of Science and Technology, Changsha 410004, Hunan, China
Abstract:The current method for the multi-factor cost control of post-earthquake reconstruction projects has low control accuracy because it ignores the deviation caused by the factors that affect project cost. Therefore, the multi-factor model based on the gray model for the cost control of post-earthquake reconstruction projects is necessary. In reference to the factors that affect the cost of reconstruction projects, we analyze the schedule deviation caused by the absence of management procedures for post-earthquake reconstruction projects, the quality deviation caused by the influence of design capability, and the price deviation caused by the instability of supply and demand in the construction materials market. In addition, we calculate the deviation coefficients caused by various factors and obtain results for the overall deviation of reconstruction projects with increased accuracy. The cost control constraint function is constructed and used in combination with the gray model, and the multi-factor cost control model of the post-earthquake reconstruction project is then established. Experimental results show that the model has high accuracy, low deviation from the actual value, and high credibility. The model can reduce project costs when used in the omnidirectional dynamic management of reconstruction projects.
Keywords:post-earthquake  gray model  reconstruction project  multi-factor cost  control  deviation
点击此处可从《西北地震学报》浏览原始摘要信息
点击此处可从《西北地震学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号