首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Field test of an intelligent stiffener for bridges at the I-35 Walnut Creek bridge
Authors:William Neff Patten  Jinghui Sun  Guangjun Li  Jeff Kuehn  Gang Song
Abstract:The addition of controllable hardware to structures to mitigate vibration that results from dynamic loads is an emerging area of technological development. The paper describes the results of a research project that was conducted to test a relatively new approach to structural control: an adjustable semi-active hydraulic actuation system that was attached to an in service interstate bridge. The system, which is powered by a 12-volt automative battery, has been tested over a 2- year period. Data indicates that the system reduces truck induced peak stresses by over 50 per cent, and calculations, per NCHRP 299, indicate that the safe life of the structure is increased by approximately 50 yr. The installed cost of the system represents less than 10 per cent of the cost to replace the bridge. Copyright © 1999 John Wiley & Sons, Ltd.
Keywords:intelligent stiffener  semi-active control  vibration  bridge  safe life  hydraulic
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号