Abstract: | In this paper,another nailed retaining wall combined with vertical steel grouting tube and nailed retaining wall is introduced, when the permeate coefficient is less than 10~(-5)cm/sec,the excavating depth is less than 5.0m and When the project is not large,this method will be first,applied;doing the pre-grouting in steel tube,then the construction of nailed retaining wall,good mechanical economical effect can be obtained. |