首页 | 本学科首页   官方微博 | 高级检索  
     

基于GMS鄱阳湖拟建枢纽对地下水影响探讨
引用本文:兰盈盈,曾马荪,靳孟贵,邹友琴,陈保平,吴力泓. 基于GMS鄱阳湖拟建枢纽对地下水影响探讨[J]. 水文, 2015, 35(6): 37-41
作者姓名:兰盈盈  曾马荪  靳孟贵  邹友琴  陈保平  吴力泓
作者单位:1.中国地质大学环境学院2.南昌工程学院水利与生态工程3.江西省勘测设计研究院4.南昌大学环境与化学工程学院
基金项目:江西省重大科研专项计划项目(项目编号20124ABE02104);江西省教育厅青年科学基金项目(GJJ11254);科技计划项目(20151BBG70008);
摘    要:针对拟建鄱阳湖水利枢纽工程对地下水影响问题,选择赣江三角洲为代表区,采用资料收集、野外调查、统计分析和数值模拟等方法进行研究。依据地质钻探资料、地下水与河流动态关系、区域数字高程模型,结合鄱阳湖历史形成与演化过程确定研究区边界条件,运用GMS模拟软件建立了研究区地下水三维运动模型。依据推荐的枢纽调度方案,利用数值模型计算枢纽运行后对地下水运动影响的时空变化规律。结果表明:枯水年份影响大,距离河流、坝址近的地方影响大,反之亦然。影响幅度范围0~2m,地下水径流交替因此减弱,丰水年份土壤潜育化面积增加9.3%。

关 键 词:鄱阳湖水利枢纽工程;地下水模拟;地下水位;GMS
收稿时间:2014-06-08

Discussion on Effects of Proposed Water Structure on Poyang Lake Groundwater Using GMS
LAN Yingying,ZENG Masun,JIN Menggui,ZOU Youqin,CHEN Baoping,WU Lhong. Discussion on Effects of Proposed Water Structure on Poyang Lake Groundwater Using GMS[J]. Hydrology, 2015, 35(6): 37-41
Authors:LAN Yingying  ZENG Masun  JIN Menggui  ZOU Youqin  CHEN Baoping  WU Lhong
Affiliation:1.School of Environmental Studies, China University of Geosciences,W uhan 430074,China;2.Academy of Hydraulic and Ecology Engineering,Nanchang Institute of Technology, Nanchang330099,China;3.Survey and Design Institute of Jiangxi Province, Nanchang 330095,China;4.School of Enwironmental and Chemical Engineering, NanchangUniversity, Nanchang 330031,China
Abstract:In this paper, the historical data,field survey, statistical analysis, numerical simulation were adapted, and Canjiang River Delta wasselected as typical researeh area to aim at the efects of a water stucture on the groundwater in the Poyang Lake Basin.The boundary conditionswere determined based on regional geological and hydrogeologicaldata, dynamic relationship befween groundwater and river,regional digital ele-vation model, and historical formation and evolution of the Poyang Lake. A three-dimensional groundwater flow model for the study area was er-tablished using CMS software. Then, the flow model was used to simulate the structure impact on the groundwater aceording to the schedulingscheme of thestructure. The results show that there are big impact in dry years,large effect on the places near the river and dam, and vice versa.Thegroundwater level raised -2m, groundwater runoff altermately decreased, and soilgleization area increased by9.3% in wet year.
Keywords:Water Conservancy Project for Poyang Lake   groundwater modeling   groundwater level   GMS
本文献已被 CNKI 等数据库收录!
点击此处可从《水文》浏览原始摘要信息
点击此处可从《水文》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号