半硬半软岩层小净距隧道洞口段监测分析
引用本文:韩同春,郑俊清,朱建才,黄福明,史生志.半硬半软岩层小净距隧道洞口段监测分析[J].岩土力学,2010,31(Z2):303-307.
作者姓名:韩同春  郑俊清  朱建才  黄福明  史生志
作者单位:1.浙江大学 软弱土与环境土工教育部重点实验室,杭州 310058;2.浙江大学 岩土工程研究所,杭州 310058; 3.浙江大学 建筑设计研究院,杭州 310027;4.浙江大学 防灾工程研究院,杭州 310058
摘    要:针对雷公浦小净距隧道后行左洞洞口段具有半硬岩层半软岩层的特点,在开挖过程中,按照新奥法对隧道地表沉降、拱顶下沉、水平收敛、中间岩柱的位移、锚杆轴力、围岩压力和钢拱架应力等项目进行监测。监测结果表明,采用预留核心土法可以较好地控制围岩变形和应力;后行洞的拱顶沉降大于先行洞,且软岩一侧的下沉量更大;中间岩柱较薄弱,开挖初期往先行洞方向移动;降雨对围岩变形和压力影响较大,施工中应引起重视。研究结论可为类似条件下工程的设计、施工和监测提供借鉴。

关 键 词:小净距隧道  半硬岩层半软岩层  洞口段  隧道工程  监控量测
收稿时间:2010-06-22

Monitoring analysis of outlet section of tunnels with small clear-distance in half-hard and half-soft rock strata
HAN Tong-chun,ZHENG Jun-qing,ZHU Jian-cai,HUANG Fu-ming,SHI Sheng-zhiP.Monitoring analysis of outlet section of tunnels with small clear-distance in half-hard and half-soft rock strata[J].Rock and Soil Mechanics,2010,31(Z2):303-307.
Authors:HAN Tong-chun  ZHENG Jun-qing  ZHU Jian-cai  HUANG Fu-ming  SHI Sheng-zhiP
Institution:1. MOE Key Laboratory of Soft Soils and Geoenvironmental Engineering, Zhejiang University, Hangzhou, 310058, China;2. Institute of Geotechnical Engineering, Zhejiang University, Hangzhou 310058, China;3. Architectural Design and Research Institute, Zhejiang University, Hangzhou 310027, China; 4. Institute of Disaster Prevention College of Civil Engineering, Zhejiang University, Hangzhou 310058, China
Abstract:Based on the characteristics of half-hard and half-soft at outlet section of latter excavated left hole of Leigongpu tunnel with small clear-distance, the monitoring programs including ground settlement of the tunnel, vault settlement, horizontal convergence, the displacement of the middle pillar, axial force of the anchor, surrounding rock pressure and the stress of steel frame, and so on are conducted in the excavation process of the tunnel according to the new Austrian tunneling method. The monitoring results show that: the reservation soil core method can better control the deformation and stress of the surrounding rock; the vault settlement of the latter hole is greater than that of the foregoing hole, and the settlement on the side of the soft rock is much greater; the middle pillar is relatively weak, which moves to the foregoing hole in the initial excavation; rainfall greatly influences the deformation and pressure of surrounding rocks, which should be paid much attention in the construction process. The experiences and conclusions presented can be adopted in the design, construction and research of similar tunnels.
Keywords:small clear-distance tunneling  half-hard and half-soft rock strata  outlet section  tunneling engineering  site monitoring