Investigation of the integrated retaining system to limit deformations induced by deep excavation
Authors:Aswin Lim  Chang-Yu Ou  Pio-Go Hsieh
Affiliation:1.Department of Civil and Construction Engineering,National Taiwan University of Science and Technology,Taipei,Taiwan;2.Department of Civil Engineering,Universitas Katolik Parahyangan,Bandung,Indonesia;3.Department of Assets and Property Management,Hwa Hsia University of Technology,New Taipei City,Taiwan
Abstract:A series of three-dimensional finite element analyses of deep excavations with the integrated system between buttress walls and diaphragm walls was conducted to investigate the effect of the buttress wall intervals, treatments, locations, height, and thickness on limiting deformations induced by deep excavation. The integrated retaining system was formed by maintaining buttress walls when soil was excavated. The wall deflection control mechanism of the integrated retaining system mainly came from the combined stiffness between the buttress wall and the diaphragm wall. In addition, the ground settlement control mechanism came from the combined stiffness between the buttress wall and the diaphragm wall, and the frictional resistance between the buttress wall and the surrounding soil. For achieving 50% reduction in the wall deflection and the ground surface settlement, the length and intervals of buttress walls that were applied to the integrated retaining system were at least 4 and 8 m, respectively. When the deflection at the diaphragm wall head was well restrained, for example, by the floor slab, the position of the buttress wall head could be located at a depth the diaphragm wall starts to bulge out. In such a case, the performance between the full height and limited height of buttress walls was quite close. Furthermore, a new well-documented excavation project was analyzed to verify the performance of the integrated retaining system. Results showed that the integrated retaining system worked excellently if the joints between buttress walls and diaphragm walls were constructed properly.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号