首页 | 本学科首页   官方微博 | 高级检索  
     检索      

提高印尼AWAR-AWAR燃煤电站桩基承载力的技术措施
引用本文:王德武,张兆金.提高印尼AWAR-AWAR燃煤电站桩基承载力的技术措施[J].探矿工程,2009,36(8):69-72.
作者姓名:王德武  张兆金
作者单位:浙江省岩土基础公司,浙江宁波315040
摘    要:通过印尼AWAR—AWAR2×350MW燃煤电站桩基2次试桩,改进施工工艺,提高了软质、松散、裂隙、孔洞和蜂窝结构发育、严重漏水强风化石灰岩地层的桩基承载力,具有很好的经济和社会效益。

关 键 词:桩基  石灰岩  旋挖钻进  承载力
收稿时间:2009/7/16 0:00:00
修稿时间:2009/7/16 0:00:00

Technical Measures for Improving Bearing Capacity of Pile Foundation of AWAR-AWAR Pulverized Power Plant in Indonesia
WANG De-wu and ZHANG Zhao-jin.Technical Measures for Improving Bearing Capacity of Pile Foundation of AWAR-AWAR Pulverized Power Plant in Indonesia[J].Exploration Engineering(Drilling & Tunneling),2009,36(8):69-72.
Authors:WANG De-wu and ZHANG Zhao-jin
Institution:( Zhejiang Geotechnical Foundation Co. , Ningbo Zhejiang 315040, China)
Abstract:By the secondary pile testing in AWAR - AWAR 2 x 350MW pulverized power plant in Indonesia, the construction technology was modified with the improvement on bearing capacity of pile foundation in soft, loose, fraetured, cavity and honeycomb structure developing and weathering limestone formation.
Keywords:pile foundation  limestone  rotary drilling  bearing capacity
本文献已被 维普 等数据库收录!
点击此处可从《探矿工程》浏览原始摘要信息
点击此处可从《探矿工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号