首页 | 本学科首页   官方微博 | 高级检索  
     


Impacts of permeable interlocking concrete pavement on the runoff hydrograph: Volume reduction,peak flow mitigation,and extension of lag times
Authors:R. Andrew Tirpak  Ryan J. Winston  Melissa Feliciano  Jay D. Dorsey  Thomas H. Epps
Affiliation:1. Department of Food, Agricultural, and Biological Engineering, The Ohio State University, Columbus, Ohio;2. Department of Food, Agricultural, and Biological Engineering, The Ohio State University, Columbus, Ohio

Department of Civil, Environmental, and Geodetic Engineering, The Ohio State University, Columbus, Ohio;3. Erie Soil & Water Conservation District, Sandusky, Ohio;4. Craftwater Engineering, San Diego, California

Abstract:Permeable pavements are implemented to provide at-source treatment of urban stormwater runoff while supporting vehicular and pedestrian use. Studies on these systems have mainly focused on those treating only direct rainfall and installed atop well-drained soils which typically provide substantial hydrologic mitigation through exfiltration that may not be representative of more hydrologically taxing conditions. A single lane parking area retrofitted with permeable interlocking concrete pavement in Vermilion, OH, USA was monitored over a 15-month period to quantify its hydrologic performance under such conditions. The 470 m2 permeable pavement was underlain by silt loam soils and a shallow bedrock layer and treated run-on from the adjacent 324 m2 asphalt drive lane. Observed data were compared to a calibrated SWMM model developed to simulate the pre-retrofit conditions of the site (i.e., a completely impervious parking lot). Cumulative runoff volumes were reduced by 43% across all events in the monitoring period compared to a fully impervious parking lot. While median peak flows were reduced by 75%, substantial mitigation was limited to smaller, lower intensity events with longer antecedent dry periods (i.e., non-flood producing events). The permeable pavement significantly delayed the occurrence of peak flows from the site following peak rainfall intensity by a median 29 min. Results from this study demonstrate that permeable pavements which receive run-on from adjacent imperious cover and are installed atop poorly drained soils can significantly reduce runoff volumes and peak flow rates and delay the occurrence of peak discharge. The modelling approach implemented can provide a better estimation of diffuse inflows to green infrastructure stormwater controls and aid in refining design features which enhance the hydrologic performance in systems underlain by poorly drained soils.
Keywords:lag time  peak flow mitigation  permeable interlocking concrete pavement  pervious pavement  porous pavement  volume reduction
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号