首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Early Stage Characteristics of Macro Engineering and Suggestions for the Taiwan Strait Tunnel Project
Abstract:Taiwan Strait Tunnel (TST) is a Macro Engineering Project (MEP). Countries all over the world have accumulated much experience on MEPs. To study the early stage characteristics of MEPs would be significant for advancing the progress of TST project. This article summarizes some common characteristics in early stage of MEPs, such as Three Gorges, South-to-North Water Diversion, The Channel Tunnel, Confederation Bridge projects, and so on. Some suggestions on early stage development are given to TST project for reference.
Keywords:Macro Engineering Project (MEP)  early stage  Taiwan Strait Tunnel (TST)
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号