首页 | 本学科首页   官方微博 | 高级检索  
     

黑龙江宝清露天煤矿首采区多层含水层地下水数值模拟
引用本文:方樟,肖长来,姚淑荣,马喆,许斌,任妍儒. 黑龙江宝清露天煤矿首采区多层含水层地下水数值模拟[J]. 吉林大学学报(地球科学版), 2010, 40(3): 610-616. DOI: 10.3969/j.issn.1671-5888.2010.03.018
作者姓名:方樟  肖长来  姚淑荣  马喆  许斌  任妍儒
作者单位:1.吉林大学 环境与资源学院,长春 130026;2.黑龙江省一一零煤田地质队,黑龙江 双鸭山 155100;3.白城市水利局,吉林 白城 137000;4.辽宁省观音阁水库管理局,辽宁 本溪 117100
基金项目:"十一·五"国家科技支撑项目,高等学校博士学科点专项科研项目 
摘    要:露天煤矿开采的矿坑排水量和水位降深是决定煤矿首采时间的关键问题。利用GMS软件建立了黑龙江省东部宝清露天煤矿首采区三层含水层和两层弱透水层组成的地下水渗流数值模拟模型,再利用实测资料对所建立的模型进行了参数识别和模型验证。在综合考虑经济效益和降水效果的条件下,再利用该模型对不同方案下地下水流场的变化进行了预测,据此提出了露天煤矿首采区最优的布井方案(86眼降水井)及相应的开采量(95 718.84 m3/d),预测了首采区地下水位的下降过程(平均下降速度为0.17 m/d)。

关 键 词:露天煤矿  多层含水层  数值模拟  地下水开采预报  地下水  
收稿时间:2009-06-29

Groundwater Numerical Simulation of Muti-Aquifers in the First Exploiting Region of Baoqing Open-Cast Coal in Heilongjiang Province
FANG Zhang,XIAO Chang-lai,YAO Shu-rong,MA Zhe,XU Bin,REN Yan-ru. Groundwater Numerical Simulation of Muti-Aquifers in the First Exploiting Region of Baoqing Open-Cast Coal in Heilongjiang Province[J]. Journal of Jilin Unviersity:Earth Science Edition, 2010, 40(3): 610-616. DOI: 10.3969/j.issn.1671-5888.2010.03.018
Authors:FANG Zhang  XIAO Chang-lai  YAO Shu-rong  MA Zhe  XU Bin  REN Yan-ru
Affiliation:1.College of Environment and Resources, Jilin University, Changchun 130026, China;
2.Heilongjiang Province Coalfield Geology 110 Survey Team, Shuangyashan, Heilongjiang 155100,China;
3.Baicheng Water Resources Bureau|Baicheng, Jilin 137000, China;
4.Guanyinge Reservoir Administrative Bureau in Liaoning Province, Benxi|Liaoning 117100, China
Abstract:Yield of groundwater and its decline process are key issues for the exploitation time of the open-cast coal. Groundwater numerical model including three aquifers and two aquitards is built using GMS in the Baoqing open-cast coal in the Eastern Heilongjiang Province. The model is calibrated and validated according to measured data. Considering both economic benefits and dewatering effect,the flow field of different schemes are predicted by the model. Based on the result the best scheme of dewatering well design (86 dewatering wells) and the corresponding yield of abstraction(95 718.84 m3/d) are determined. The process of groundwater level decline in the first exploiting region is presented too, the average decline speed in 0.17 m/d. The result provides technical support for solving practical key problems in dewatering projects such as number of dewatering wells and their location design, yield of single well, and the prediction of decline speed of groundwater level.
Keywords:open-cast coal  muti-aquifers  numerical simulation  groundwater exploitation prediction  groundwater  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《吉林大学学报(地球科学版)》浏览原始摘要信息
点击此处可从《吉林大学学报(地球科学版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号