首页 | 本学科首页   官方微博 | 高级检索  
     检索      


The North American datum of 1983: Project methodology and execution
Authors:Charles R Schwarz  Elizabeth B Wade
Institution:(1) National Geodetic Survey Division Office of Charting and Geodetic Services, NOS, NOAA, 20852 Rockville, Maryland, USA
Abstract:A new adjustment of the geodetic control networks in North America has been completed, resulting in a new continental datum—the North American Datum of 1983 (NAD 83). The establishment ofNAD 83 was the result of an international project involving the National Geodetic Survey of the United States, the Geodetic Survey of Canada, and the Danish Geodetic Institute (responsible for surveying in Greenland). The geodetic data in Mexico and Central America were collected by the Inter American Geodetic Survey and validated by the Defense Mapping Agency Hydrographic/Topographic Center. The fundamental task ofNAD 83 was a simultaneous least squares adjustment involving 266,436 stations in the United States, Canada, Mexico, and Central America. The networks in Greenland, Hawaii, and the Caribbean islands were connected to the datum through Doppler satellite and Very Long Baseline Interferometry (VLBI) observations. The computations were performed with respect to the ellipsoid of the Geodetic Reference System of 1980. The ellipsoid is positioned in such a way as to be geocentric, and its axes are oriented by the Bureau International de l'Heure Terrestrial System of 1984. The mathematical model for theNAD readjustment was the height-controlled three-dimensional system. The least squares adjustment involved 1,785,772 observations and 928,735 unknowns. The formation and solution of the normal equations were carried out according to the Helmert block method. Authors' note:This article is a condensation of the final report of the NAD 83 project. The full report (Schwarz,1989) contains a more complete discussion of all the topics.]
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号