首页 | 本学科首页   官方微博 | 高级检索  
     


Phosphorus removal from secondary effluents through integrated constructed treatment system
Authors:Xiong Jibing  Qin Yong  Mahmood Qaisar  Liu Hanhu  Yang Dejun
Affiliation:Jiangsu Key Laboratory of Resources and Environmental Information Engineering, School of Environment Science & Spatial Informatics, China University of Mining and Technology, Xuzhou, Jiangsu Province 221116, China. xiongjib108@163.com
Abstract:The treatment capacity of an integrated constructed treatment system (CTS) was explored which was designed to reduce phosphorus (P) from secondary effluents. The integrated CTS was combined with vertical-flow constructed wetland, floating bed and sand filter. The vertical wetland was filled from the bottom to the top with gravels, steel slag and peat. Vetiverzizanioides (L.) Nash was selected to grow in the vertical constructed wetland while Coixlacrymajobi L. was grown in floating bed. The results suggested that integrated CTS displayed excellent removal efficiency for chemical oxygen demand (COD), dissolved phosphorus (DP), and total phosphorus (TP). The average COD removal efficiency of the integrated CTS was 90.45% after 40 days of operation, the average DP and TP removal efficiencies of the integrated CTS were 97.43% and 96.40%, respectively. The integrated CTS has good potential in removing COD as well as P from secondary effluents.
Keywords:
本文献已被 PubMed 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号