首页 | 本学科首页   官方微博 | 高级检索  
     

厚松散层及超薄覆岩条件下放顶煤开采防砂煤柱
引用本文:桂和荣,孙家斌,李明好,尹正柱,李伟,陈富勇,宋晓梅. 厚松散层及超薄覆岩条件下放顶煤开采防砂煤柱[J]. 煤田地质与勘探, 2002, 30(2): 36-39
作者姓名:桂和荣  孙家斌  李明好  尹正柱  李伟  陈富勇  宋晓梅
作者单位:1. 淮南工业学院, 安徽 淮南 232001;
摘    要:为解放厚松散层及超薄覆岩条件下防砂煤柱储量,在掌握三隔、四含水文工程地质条件基础上,通过井下疏放四含水、合理确定允许放采比以及控制工作面两端覆岩剪切破坏,有效实践了“破坏四含、保护三含”的思路。项目自实施以来,已成功回采了40多万t煤炭,直接经济效益4000多万元。 

关 键 词:防砂煤柱   渗透稳定性   允许放采比   顶板
文章编号:1001-1986(2002)02-0036-04
收稿时间:2001-11-05

Study of mining the safety pillar against sand by caving method under conditions of thick ravelly ground and super thin capping rock
GUI He rong,SUN Jia bin,LI Ming hao,YIN Zheng zhu,LI Wei,CHEN Fu yong,SONG Xiao mei. Study of mining the safety pillar against sand by caving method under conditions of thick ravelly ground and super thin capping rock[J]. Coal Geology & Exploration, 2002, 30(2): 36-39
Authors:GUI He rong  SUN Jia bin  LI Ming hao  YIN Zheng zhu  LI Wei  CHEN Fu yong  SONG Xiao mei
Affiliation:1. Huainan Institute of Technolology, Huainan 232001, China;2. Huaibei Mine Group, Huaibei 235000, China
Abstract:In order to mine the safety pillar against sand under the conditions of the thick ravelly ground and the superthin capping rock, we put into an effect idea of breaking the fourth aquifer and protecting the third aquifer of the Quaternary system on the basis of the hydrogeologic conditions of the third aquifuge and the fourth aquifer by means of mine dewatering from the fourth aquifer, reasonably determining the ratio of the caving height and the mining height and preventing the shearing break in the capping rock over the working face to control the roof stability effectively.The coal more than 4×105 t have been mined successfully since the study of the question, the profit of which is about 40 million Yuan. 
Keywords:safety pillar against sand  permeating stability  ratio of the caving height and mining height  coal seam roof
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《煤田地质与勘探》浏览原始摘要信息
点击此处可从《煤田地质与勘探》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号