摘    要:在采用双侧壁导坑法施工的双向八车道特大断面连拱隧道中,施工步繁多,临时支护设置的时间长,隧道全断面的变形量测只能在临时支护拆除后进行。由于全断面变形数据获取得较晚,故较难将其用于围岩力学参数的反演。将有限元计算和BP神经网络技术相结合,并在有限元计算过程中考虑实际的施工步,建立起所有临时支护拆除之前这一施工状态下导坑的变形量与围岩力学参数之间的非线性映射关系,并通过对应状态下实测的导坑变形值反演了围岩的力学参数。将反演的结果用于正分析验算,验证了该方法是可行的。

关 键 词:隧道工程  双连拱隧道  位移反分析  有限元  BP神经网络
收稿时间:2011-01-24
修稿时间:1900-01-01

Back Analysis on Mechanical Parameters of Surrounding Rock in a Bi-arch Tunnel with Eight Lanes
CUI Zhi-sheng,JIN Lei and ZHAO Kai. Back Analysis on Mechanical Parameters of Surrounding Rock in a Bi-arch Tunnel with Eight Lanes[J]. Exploration Engineering:Rock & Soil Drilling and Tunneling, 2011, 38(5): 65-69
Authors:CUI Zhi-sheng  JIN Lei  ZHAO Kai
Affiliation:1.Office of Pingyang Highway Construction and Management,Yangquan Shanxi 045100,China;2.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China)
Abstract:In a bi-arch tunnel with eight lanes using double-side-drift method,it is the deformation of the drifts rather than the whole tunnel section that is measured due to the restriction from the temporary linings.Only by the time when all the temporary linings are removed can the back analysis be implemented if we choose to use the whole section's deformation data to get the mechanical parameters of surrounding rock,which is time-consuming.This paper discusses a method which involves both FEM and BP neural network to establish a nonlinear mapping relationship between surrounding rock's mechanical parameters and drifts' final deformation rather than the whole section's deformation with construction sequences taking into consideration,followed by a back analysis on the mechanical parameters using the drifts' in-situ monitoring deformation data on the basis of the above relationship.There's a good agreement between the in-situ deformation data and the numerical deformation data achieved from a normal analysis using the back analyzed parameters.
Keywords:tunneling engineering  bi-arch tunnel  displacement back analysis  FEM  BP neural network
本文献已被 维普 等数据库收录!
点击此处可从《探矿工程》浏览原始摘要信息
点击此处可从《探矿工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号