首页 | 本学科首页   官方微博 | 高级检索  
     检索      


The timing of runoff response in design flood analysis
Authors:A Ashfaq  P Webster
Abstract:This study presents an investigation of the time to peak of unit response functions for design flood studies. It is based on an empirical analysis of observed rainfall–runoff data for 49 basins in the UK and explores the relationship between unit response time to peak (tp) and flood peak magnitude (Qp). The results show that tp varies significantly between events but suggest a systematic relationship between tp and Qp. The relationships which have been developed suggest that tp decreases with flood magnitude and approaches to an asymptotic value for very large values of Qp. These findings confirm numerous physical and field investigations and also support the reduction in response time for probable maximum flood (PMF) recommended in the Soil Conservation Services method, the Flood Studies Report method and the Flood Estimation Handbook. The findings also suggest that tp should be modified in unit hydrograph methods of design flood analysis for return periods that differ from those used in deriving unit hydrographs. A simple correction curve has been developed for adjusting tp according to the design flood return period. Copyright © 2000 John Wiley & Sons, Ltd.
Keywords:unit hydrograph  time to peak  non‐linearity
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号