首页 | 本学科首页   官方微博 | 高级检索  
     检索      

梯级水电开发对大通河流域洪水过程的影响分析
引用本文:黄维东,牛最荣,刘彦娥,王毓森.梯级水电开发对大通河流域洪水过程的影响分析[J].水文,2016,36(4):58-65.
作者姓名:黄维东  牛最荣  刘彦娥  王毓森
作者单位:甘肃省水文水资源局;黄河水利委员会水文局
基金项目:国家自然科学基金项目(91125015);水利部公益性行业科研专项经费项目(201301083)
摘    要:应用大通河流域实测洪水资料和水利普查数据,定性和定量分析了梯级水电开发对流域洪水过程和洪水特征的影响,建立了梯级水电站数量与洪水涨落率、涨落频次的数学关系模型。结果表明:随着流域水电站数量的增多,洪水过程变化频繁,洪水涨落率增大,涨落频次增多;梯级水电开发使流域最大洪峰流量增大了19.7%~21.5%,最大洪峰传播时间减少了6.1%,而对次洪水总量的影响较小。研究水文过程受人类活动的影响规律,对加强流域水电站统一调度、水能水资源可持续利用和水生态文明建设具有十分重要的意义。

关 键 词:梯级水电站  洪水过程  洪水涨落率  洪水涨落频次  影响分析  大通河
收稿时间:2015/6/2 0:00:00

Effect of Cascade Hydroelectric Development on Flood Process in Datonghe River Basin
HUANG Weidong,NIU Zuirong,LIU Yane,WANG Yusen.Effect of Cascade Hydroelectric Development on Flood Process in Datonghe River Basin[J].Hydrology,2016,36(4):58-65.
Authors:HUANG Weidong  NIU Zuirong  LIU Yane  WANG Yusen
Institution:HUANG Weidong;NIU Zuirong;LIU Yane;WANG Yusen;Hydrology and Water Resources Bureau of Gansu Province;Hydrology Bureau,YRCC;
Abstract:The effect of the cascade hydroelectric development on the flood process and characteristics in the Datonghe River Basin was qualitatively and quantitatively analyzed by using the observed flood data and water resources survey data. The mathematical model was established to analyze the relationship between the number of hydropower stations, flood fluctuation rate, and flood fluctuation frequency at the representative hydrometry stations. The results show that the flood process changes frequently, flood fluctuation rate and fluctuation frequency increase along with the number of the hydropower stations increasing. The cascade hydroelectric development makes the maximum flood peak flow increase by 19.7%-21.5%, the flood routing duration decrease by 6.1%, while less effect on the total amount of a flood. The research on the influence regularity of human activities on hydrological process is very significant for strengthening unified dispatching of hydropower stations in a river basin, water sustainable utilization of water resources and water ecological civilization construction.
Keywords:cascade hydropower station  flood process  flood fluctuation rate  flood fluctuation frequency  impact analysis  Datonghe River
本文献已被 CNKI 等数据库收录!
点击此处可从《水文》浏览原始摘要信息
点击此处可从《水文》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号