首页 | 本学科首页   官方微博 | 高级检索  
     检索      

高喷灌浆技术在防渗加固长善垸浏阳河防洪大堤堤基中的应用
引用本文:蒋友清.高喷灌浆技术在防渗加固长善垸浏阳河防洪大堤堤基中的应用[J].湖南地质,1999(Z1).
作者姓名:蒋友清
作者单位:长沙市水利水电勘测设计院
摘    要:高喷灌浆在长善垸浏阳河防洪大堤第四系松散地基的防渗、加固中效果显著,与其它防渗措施比较,其施工速度快,成本低,在深度覆盖层堤基防渗中显示出无可比拟的优越性。

关 键 词:防洪大堤  高喷灌浆  防渗加固  长善垸

APPLICATION THE HIGH PRESURE SPURT GROUTING TECHNOLOGY IN CONTROL SEEPAGE AND CONSOLIDATING OF THE LIUYANG RIVER CONTROL FLOOD DYKE FOUNDATION AT CHANGSHANYUAN
Jiang Youqing,Changsha Institute of Water Conservancy and Electrity Survey and Design,Changsha.APPLICATION THE HIGH PRESURE SPURT GROUTING TECHNOLOGY IN CONTROL SEEPAGE AND CONSOLIDATING OF THE LIUYANG RIVER CONTROL FLOOD DYKE FOUNDATION AT CHANGSHANYUAN[J].Hunan Geology,1999(Z1).
Authors:Jiang Youqing  Changsha Institute of Water Conservancy and Electrity Survey and Design  Changsha
Institution:Jiang Youqing Changsha Institute of Water Conservancy and Electrity Survey and Design Changsha 410007
Abstract:The high presure spurt grouting technology has the obvious effect on control seepage and consolidating of the Quaternary incoherent foundation of the Liuyang river control flood dykes at Changshanyuan,this method's construction is quick and cost is lower matching with the other control seepage measures.It shows the incomparable advantage in the control seepage of the thicker capping embankment foundation
Keywords:Control flood dyke  High presure spurt grouting  Control seepage and consolidating  Changshanyuan  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号